![background image](http://html1.mh-extra.com/html/yardline/berkdale-14-x-8/berkdale-14-x-8_manual_3174629035.webp)
33
PARTS REQUIRED:
3" (7,6 cm)
x1
FRONT WALL
2" (5,1 cm)
x2
x13
1-1/2" (3,8 cm)
Fig. A
Flush
BEGIN
Stand front wall on floor.
Center front wall on the 168" (426,7 cm)
floor dimension.
Secure top and bottom of wall using one 2"
screw into top and bottom plate
(Fig A)
.
1
Nail gable
wall panel to front wall stud using 1-1/2" nails 6" apart
(Fig. B)
.
ENSURE GABLE AND FRONT WALL PANELS ARE FLUSH BEFORE SECURING.
6" (15,2 cm)
Fig. B
1-1/2"
(3,8 cm)
Nails
Fig. C
3" (7,6 cm)
Screw
3" (7,6 cm)
Screw
BE SURE TOP OF WALL FRAMES ARE FLUSH.
Flush
Secure gable wall top plate using one 3" screw toe-screwed into front wall frame at an angle
as shown
(Fig. C)
.
168
"
(42
6,7
cm)