
14
4. Operation procedures
Operation method- Setting of drying chamber
(1) Turn on the leakage protection switch on the
backside of the control box.
(2) Turn on the POWER switch on the operation panel.
The Temperature adjuster and keystroke displays.
After the power is on, the initial page of the touch
panel displays for 4 seconds, and then shift to
standby page.
Press the Setting button to enter into the set page of
HEAD.
(3) Press HEAD button to make the upper frame moving
upward.
(Head lifts by 5cm, and rotated by 90
°
)
At this moment, lift the Head by using your hand.123
※
When the HEAD button is ON, the HEAD indicator
light flickers .
The HEAD button light is on.
After setting the drying chamber, help its upper
chamber to rotate, and then return to the upper
position of the drying chamber. Press down the
HEAD button for the drying chamber and the upper
part of the chamber to be closely connected.
The Head indicator light goes out.
The HEAD button light goes out also.
※
After the drying chamber is set, press down the
NEXT button to jump to next page.
When the BACK button is pressed down, it will
return to the standby page.
(4)Please switch on the cold air valve(manual valve)
(cold air valve(manual valve) is located at the center
of the backside of the HEAD)
Leakage current breaker