
13
4. Operation procedures
Preparations before operation
(
20
)
Install the outlet temperature sensor on the nipple of the connecting pipe joint. Insert the
plug into the connector
「
Outlet
Temp
Sensor
」
in front of the control box.
(
21
)
Install the sample tube on the liquid delivery pump, and then connect it to the nipple of the
nozzle.
(
22
)
To solve the hot wind or particles caused by the blower, you can install the attached exhaust
duct at the vent of the blower. (inner dia. 50mm, length 3m, with cuffs on each side), so that
it can exhaust air through the ventilated containers.