ENGINE
3-19
EAM30383
VALVE CLEARANCE SHIM CHART
INTAKE
Example:
Valve clearance (cold) 0.12–0.19 mm (0.0047–0.0075 in)
Installed is 175.
Measured clearance 0.27 mm (0.0106 in)
Replace 175 pad with 185 pad.
Pad No. 175 = 1.75 mm (0.0689 in)
Pad No. 185 = 1.85 mm (0.0728 in)
0.12 0.19
0.25
0.29 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240
0.30 0.34 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240
0.35 0.39 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240
0.40 0.44 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240
0.45 0.49 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240
0.50 0.54 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240
0.55 0.59 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240
0.60
0.64 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240
0.65 0.69 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240
0.70 0.74 175 180 185 190 195 200 205 210 215 220 225 230 235 240
0.75 0.79 180 185 190 195 200 205 210 215 220 225 230 235 240
0.80 0.84 185 190 195 200 205 210 215 220 225 230 235 240
0.85 0.89 190 195 200 205 210 215 220 225 230 235 240
0.90 0.94 195 200 205 210 215 220 225 230 235 240
0.95 0.99 200 205 210 215 220 225 230 235 240
1.00
1.04 205 210 215 220 225 230 235 240
1.05 1.09 210 215 220 225 230 235 240
1.10 1.14 215 220 225 230 235 240
1.15 1.19 220 225 230 235 240
1.20 1.24 225 230 235 240
1.25 1.29 230 235 240
1.30 1.34 235 240
1.35 1.39 240
120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240
0.02 0.06
120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230
0.00 0.01
120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225
0.07 0.11
120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235
0.20 0.24 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240
A. Measured clearance
B. Installed pad number
C. Standard clearance
Summary of Contents for YZ 2019 Series
Page 6: ...EAM20162 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 40: ...MOTORCYCLE CARE AND STORAGE 1 28...
Page 63: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 72: ...CABLE ROUTING DIAGRAM 2 31 EAM20152 CABLE ROUTING DIAGRAM...
Page 74: ...CABLE ROUTING DIAGRAM 2 33...
Page 76: ...CABLE ROUTING DIAGRAM 2 35...
Page 78: ...CABLE ROUTING DIAGRAM 2 37...
Page 80: ...CABLE ROUTING DIAGRAM 2 39...
Page 82: ...CABLE ROUTING DIAGRAM 2 41...
Page 84: ...CABLE ROUTING DIAGRAM 2 43...
Page 86: ...CABLE ROUTING DIAGRAM 2 45...
Page 126: ...ELECTRICAL SYSTEM 3 38...
Page 177: ...FRONT FORK 4 49 1...
Page 196: ...CHAIN DRIVE 4 68...
Page 217: ...CAMSHAFT 5 18 Spark plug Spark plug 13 N m 1 3 kgf m 9 6 lb ft T R...
Page 237: ...ELECTRIC STARTER 5 38...
Page 256: ...OIL PUMP AND BALANCER GEAR 5 57 a 2 10 b 2 9 1 b 5 3 a 4 10 5 9 3 E c d 6 7 8 8 b 6...
Page 262: ...GENERATOR AND STARTER CLUTCH 5 63 1 a 3 3 2 4...
Page 276: ...TRANSMISSION 5 77...
Page 284: ...WATER PUMP 6 7...
Page 290: ...FUEL TANK 7 5 A Left B Right 1 1 A 0 mm 0 in B 1 1 15 mm 0 59 in...
Page 296: ...THROTTLE BODY 7 11...
Page 299: ......
Page 313: ...CHARGING SYSTEM 8 14...
Page 343: ...FUEL INJECTION SYSTEM 8 44...
Page 347: ...FUEL PUMP SYSTEM 8 48...
Page 348: ...ELECTRICAL COMPONENTS 8 49 EAM20147 ELECTRICAL COMPONENTS 9 10 1 3 2 4 5 6 7 8...
Page 350: ...ELECTRICAL COMPONENTS 8 51 11 10 9 2 3 1 6 7 8 4 5...
Page 352: ...ELECTRICAL COMPONENTS 8 53 EAM30289 CHECKING THE SWITCHES 4 1 3 2 B B Sb B B B B B B B B...
Page 368: ...ELECTRICAL COMPONENTS 8 69...
Page 376: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...