5 - 48
ENG
4. Install:
• V-belt
• primary fixed sheave
1
• washer
• primary sheave nut
2
NOTE:
• Install the V-belt onto the primary sheave
(when the pulley is at its widest position) and
onto the secondary sheave (when the pulley
is at its narrowest position), and make sure
the V-belt is tight.
• While holding the primary fixed sheave with
the rotor holding tool, tighten the primary
sheave nut.
5. Install:
• secondary sheave bracket
6. Install:
• dowel pins
• V-belt case gasket
• V-belt case
NOTE:
• Make sure that the V-belt case gasket lip fits
properly around the V-belt case.
• Tighten the V-belt case bolts in stages and in
a crisscross pattern.
Rotor holding tool
90890-01235
T
R
.
.
80 Nm (8.0 m · kg, 58 ft · lb)
T
R
.
.
22 Nm (2.2 m · kg, 16 ft · lb)
LT
New
Summary of Contents for YP250R 2005
Page 1: ...YP250R SERVICE MANUAL 2005 1C0 F8197 E0 ...
Page 368: ...YAMAHA MOTOR ESPAÑA S A ...