5 - 44
ENG
EAS00323
ASSEMBLING THE PRIMARY SHEAVE
1. Clean:
• primary fixed sheave
1
• primary sliding sheave
2
• spacer
3
• primary sheave weights
4
• primary sliding sheave cam face
5
2. Install:
• primary sheave weights
1
• spacer
2
NOTE:
Before installing the primary sheave weights,
lubricate the inside and outside of each weight
with Shell BT grease 3
®
.
Recommended lubricant
Shell BT grease 3
®
3. Install:
• spacers
1
• sliders
2
• cam
3
• primary sheave cap
T
R
.
.
3 Nm (0.3 m · kg, 2.2 ft · lb)
Summary of Contents for YP250R 2005
Page 1: ...YP250R SERVICE MANUAL 2005 1C0 F8197 E0 ...
Page 368: ...YAMAHA MOTOR ESPAÑA S A ...