5 - 1
ENG
EAS00188
ENGINE
ENGINE REMOVAL
LEADS, HOSES, EXHAUST PIPE AND MUFFLER
2
4
3
5
11 10
10
6
7
1
9
8
New
New
T
R
.
.
40 Nm (4.0 m
•
kg, 29 ft
•
Ib)
T
R
.
.
65 Nm (6.5 m
•
kg, 47 ft
•
Ib)
T
R
.
.
14 Nm (1.4 m
•
kg, 10 ft
•
Ib)
T
R
.
.
7 Nm (0.7 m
•
kg, 5.1 ft
•
Ib)
T
R
.
.
20 Nm (2.0 m
•
kg, 14 ft
•
Ib)
Order
Job/Part
Q’ty
Remarks
Removing the leads, hoses, exhaust
pipe and muffler
Remove the parts in the order listed.
Seat/rear side covers/footrest board/air
filter case assembly
Refer to “COVERS AND PANELS” and
“AIR FILTER CASE” in chapter 3.
Coolant
Drain.
Refer to “CHANGING THE COOLANT” in
chapter 3.
Air cut-off valve
Refer to “AIR INDUCTION SYSTEM” in
chapter 7.
Carburetor
Refer to “CARBURETOR” in chapter 7.
Starter motor
Refer to “STARTER MOTOR” in chapter
8.
1
Spark plug cap
1
2
Coolant temperature sensor connector
1
Disconnect.
3
Pickup coil/stator assembly coupler
2
Disconnect.
Summary of Contents for YP250R 2005
Page 1: ...YP250R SERVICE MANUAL 2005 1C0 F8197 E0 ...
Page 368: ...YAMAHA MOTOR ESPAÑA S A ...