2-35
CABLE ROUTING
SPEC
V Clamp the pickup coil lead.
W Clamp the starter lead side stand switch lead
horn lead with a band and then cut of the end.
Locate the end of band outside.
X Clamp the fuel pump lead to the engine stay with
a band and cut the end of band.
Y Clamp the fuel pump lead.
Z Set the brake pipe and see the white mark.
Summary of Contents for XV1600A1999
Page 1: ......
Page 2: ......
Page 8: ......
Page 10: ...E GEN INFO ...
Page 22: ...GEN INFO ...
Page 24: ...E SPEC ...
Page 51: ...2 27 ENGINE OIL FLOW DIAGRAMS SPEC 1 Valve lifter 2 Push rod 3 Rocker arm shaft 4 Crankshaft ...
Page 55: ...2 31 TRANSFER GEAR OIL FLOW DIAGRAMS SPEC 1 Transfer gear oil pump 2 Middle driven shaft ...
Page 64: ...SPEC ...
Page 128: ...CHK ADJ ...
Page 224: ...E CHAS ...
Page 225: ...E ENG CONTENTS ENGINE ENGINE 5 1 INSTALLING THE ENGINE 5 8 ...
Page 356: ...E ENG ...
Page 358: ...E CARB CHECKING THE AIR INDUCTION SYSTEM 6 26 INSTALLING THE AIR INDUCTION SYSTEM 6 26 ...
Page 387: ...6 29 E AIR INDUCTION SYSTEM CARB 13 Install fuel tank Refer to FUEL TANK in chapter 3 ...
Page 388: ...E CARB ...
Page 426: ...7 36 E SIGNALING SYSTEM ELEC EB806000 SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 458: ...TRBL SHTG ...
Page 459: ...XV1600A WIRING DIAGRAM for EUR ...
Page 460: ...XV1600AL WIRING DIAGRAM for AUS ...