E
5-68
CLUTCH
ENG
7 Nm (0.7 m
kg)
7 Nm (0.7 m
kg)
NOTE:
EAS00287
CHECKING THE PULL LEVER SHAFT AND
PULL ROD
1. Check:
pull lever shaft pinion gear teeth
a
pull rod teeth
b
Damage / wear
Replace the pull lever
shaft and pull rod as a set.
2. Check:
pull rod bearing
Damage / Replace.
EAS00292
CHECKING THE PRIMARY DRIVE
1. Check:
primary drive gear
1
primary driven gear
2
Damage / wear
Replace the primary drive
gear and clutch housing as a set.
Excessive noise during operation
Re-
place the primary drive gear and clutch hous-
ing as a set.
INSTALLING THE PICKUP COIL AND PULL
LEVER SHAFT
1. Apply
sealant
(onto the pickup coil lead grommet)
Yamaha bond No.1215
90890-85505
2. Install:
pickup coil
pickup coil lead holder
Apply locking agent (LOCTITE
) to the threads
of the pickup coil bolts and pickup coil lead hold-
er bolts.
Summary of Contents for XV1600A1999
Page 1: ......
Page 2: ......
Page 8: ......
Page 10: ...E GEN INFO ...
Page 22: ...GEN INFO ...
Page 24: ...E SPEC ...
Page 51: ...2 27 ENGINE OIL FLOW DIAGRAMS SPEC 1 Valve lifter 2 Push rod 3 Rocker arm shaft 4 Crankshaft ...
Page 55: ...2 31 TRANSFER GEAR OIL FLOW DIAGRAMS SPEC 1 Transfer gear oil pump 2 Middle driven shaft ...
Page 64: ...SPEC ...
Page 128: ...CHK ADJ ...
Page 224: ...E CHAS ...
Page 225: ...E ENG CONTENTS ENGINE ENGINE 5 1 INSTALLING THE ENGINE 5 8 ...
Page 356: ...E ENG ...
Page 358: ...E CARB CHECKING THE AIR INDUCTION SYSTEM 6 26 INSTALLING THE AIR INDUCTION SYSTEM 6 26 ...
Page 387: ...6 29 E AIR INDUCTION SYSTEM CARB 13 Install fuel tank Refer to FUEL TANK in chapter 3 ...
Page 388: ...E CARB ...
Page 426: ...7 36 E SIGNALING SYSTEM ELEC EB806000 SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 458: ...TRBL SHTG ...
Page 459: ...XV1600A WIRING DIAGRAM for EUR ...
Page 460: ...XV1600AL WIRING DIAGRAM for AUS ...