4-70
E
HANDLEBAR
CHAS
NOTE:
40 Nm (4.0 m
kg)
NOTE:
NOTE:
NOTE:
The upper handlebar holders should be
installed with the arrows
a
facing forward
A
.
Align the match marks
b
on the handlebar
with the upper surface of the lower handlebar
holders.
3. Tighten:
lower handlebar holder nuts
4. Install:
clutch lever
Align the slit of clutch lever holder with the
punch mark
a
on the handlebar.
5. Install:
clutch cable
Lubricate the end of the clutch cable with a thin
coat of lithium soap base grease.
6. Install:
left handlebar switch
Align the end
a
of the left handlebar switch
with the punch mark
b
on the handlebar.
7. Connect:
clutch switch connector
Summary of Contents for XV1600A1999
Page 1: ......
Page 2: ......
Page 8: ......
Page 10: ...E GEN INFO ...
Page 22: ...GEN INFO ...
Page 24: ...E SPEC ...
Page 51: ...2 27 ENGINE OIL FLOW DIAGRAMS SPEC 1 Valve lifter 2 Push rod 3 Rocker arm shaft 4 Crankshaft ...
Page 55: ...2 31 TRANSFER GEAR OIL FLOW DIAGRAMS SPEC 1 Transfer gear oil pump 2 Middle driven shaft ...
Page 64: ...SPEC ...
Page 128: ...CHK ADJ ...
Page 224: ...E CHAS ...
Page 225: ...E ENG CONTENTS ENGINE ENGINE 5 1 INSTALLING THE ENGINE 5 8 ...
Page 356: ...E ENG ...
Page 358: ...E CARB CHECKING THE AIR INDUCTION SYSTEM 6 26 INSTALLING THE AIR INDUCTION SYSTEM 6 26 ...
Page 387: ...6 29 E AIR INDUCTION SYSTEM CARB 13 Install fuel tank Refer to FUEL TANK in chapter 3 ...
Page 388: ...E CARB ...
Page 426: ...7 36 E SIGNALING SYSTEM ELEC EB806000 SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 458: ...TRBL SHTG ...
Page 459: ...XV1600A WIRING DIAGRAM for EUR ...
Page 460: ...XV1600AL WIRING DIAGRAM for AUS ...