ELECTRICAL COMPONENTS
9-77
EAS2GB7395
CHECKING THE SPEED SENSOR
1. Check:
• Speed sensor output voltage
Out of specification
Replace.
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Connect the test harness-speed sensor (3P)
to the speed sensor coupler and wire har-
ness.
b. Connect the pocket tester (DC20V) to the
test harness-speed sensor (3P).
c. Push the start switch.
d. Elevate the front wheel and slowly turn it.
e. Measure the voltage (DC 5 V) of white and
black/white. With the front wheel slowly ro-
tating, voltage alternates between 0 V and 5
V.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
EAS2GB7396
CHECKING THE FUEL SENDER
1. Drain the gasoline.
2. Disconnect:
• Fuel sender coupler
(from the fuel sender)
3. Remove:
• Fuel sender
(from the fuel tank)
4. Check:
• Fuel sender resistance
Out of specification
Replace the fuel
sender.
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Connect the pocket tester (
1k) to the
fuel sender as shown.
b. Measure the resistance of the fuel sender.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
EAS2GB7397
CHECKING THE RESISTER
1. Disconnect:
• Resister coupler
(from the wire harness)
2. Check:
• Resister resistance
Out of specification
Replace the resister.
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Connect the pocket tester (
10) to the re-
sister as shown.
Output voltage reading cycle
0.6V to 4.8V to 0.6V to 4.8V
Pocket tester
90890-03112
Analog pocket tester
YU-03112-C
Test harness– speed sensor 5TJ
(3P)
90890-03228
Test harness– speed sensor 5TJ
(3P)
YU-03228
• Positive tester probe
White “1”
• Negative tester probe
Black “2”
B
R
W
2
1
Fuel sender resistance
1.35–1.90 k
at 25°C (77°F)
Pocket tester
90890-03112
Analog pocket tester
YU-03112-C
• Positive tester probe
Green “1”
• Negative tester probe
Black “2”
Resister resistance
64.6–71.4
Pocket tester
90890-03112
Analog pocket tester
YU-03112-C
1
2
Summary of Contents for WR250F 2016
Page 4: ......
Page 10: ......
Page 12: ......
Page 16: ...LOCATION OF IMPORTANT LABELS 1 2 EUR ...
Page 17: ...LOCATION OF IMPORTANT LABELS 1 3 AUS NZL ZAF ...
Page 41: ...MULTI FUNCTION DISPLAY 1 27 ...
Page 78: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25 ...
Page 80: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 ...
Page 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 ...
Page 84: ...CABLE ROUTING DIAGRAM 2 31 EAS2GB7073 CABLE ROUTING DIAGRAM ...
Page 86: ...CABLE ROUTING DIAGRAM 2 33 ...
Page 88: ...CABLE ROUTING DIAGRAM 2 35 ...
Page 90: ...CABLE ROUTING DIAGRAM 2 37 ...
Page 92: ...CABLE ROUTING DIAGRAM 2 39 ...
Page 94: ...CABLE ROUTING DIAGRAM 2 41 ...
Page 96: ...CABLE ROUTING DIAGRAM 2 43 ...
Page 98: ...CABLE ROUTING DIAGRAM 2 45 ...
Page 142: ...ELECTRICAL SYSTEM 3 42 ...
Page 152: ...CHASSIS 4 9 ...
Page 162: ...FRONT WHEEL 5 8 1 1 ...
Page 226: ...CHAIN DRIVE 5 72 ...
Page 290: ...OIL PUMP AND BALANCER GEAR 6 61 a 2 10 b 2 9 1 b 5 3 a 4 10 5 9 3 E c d 6 7 8 8 b 6 ...
Page 310: ...TRANSMISSION 6 81 ...
Page 347: ...CHARGING SYSTEM 9 15 ...
Page 351: ...LIGHTING SYSTEM 9 19 ...
Page 359: ...COOLING SYSTEM 9 27 ...
Page 391: ...FUEL PUMP SYSTEM 9 59 ...
Page 394: ...ELECTRICAL COMPONENTS 9 62 12 11 10 2 3 1 6 7 4 5 8 9 ...
Page 396: ...ELECTRICAL COMPONENTS 9 64 EAS2GB7383 CHECKING THE SWITCHES 4 1 3 2 E B S E B E B E E B B ...
Page 414: ...ELECTRICAL COMPONENTS 9 82 ...
Page 425: ......
Page 426: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER ...