MULTI-FUNCTION DISPLAY
1-25
3. Run the machine and start timer measure-
ment.
4. To stop timer measurement, pushing the
“SLCT1” button and “SLCT2” button at the
same time.
TIP
If the machine is run while timer measurement
is not made, no change will occur to the digit in
tripmeter A (TRIP A).
5. To resume the measurement, again pushing
the “SLCT1” button and “SLCT2” button at
the same time.
Resetting measurement data
TIP
Resetting can be made in the following two
manners.
Resetting is possible while timer measurement
is made:
• Reset tripmeter A.
Resetting is possible while timer measurement
is not made:
• Reset tripmeter A and timer.
Resetting tripmeter A (TRIP A)
1. Check that the timer is in operation. If the
timer is not in operation, start the timer by
pushing the “SLCT1” button and “SLCT2”
button at the same time.
2. Reset tripmeter A (TRIP A) display by push-
ing the “RST” button for 2 seconds or more.
TIP
If reset, and travel distance display will go on
flashing for four seconds.
Resetting tripmeter A (TRIP A) and timer
1. Check that the timer is not in operation. If the
timer is in operation, stop it by pushing the
“SLCT1” button and “SLCT2” button at the
same time.
2. Reset all measured data by pushing the
“RST” button for 2 seconds or more.
TIP
• Resetting will reset the timer display and trav-
el distance display and put measurement on
standby.
• Auto start attempt will put measurement on
standby as such. Likewise, manual start at-
tempt will put measurement on standby as
such.
Summary of Contents for WR250F 2016
Page 4: ......
Page 10: ......
Page 12: ......
Page 16: ...LOCATION OF IMPORTANT LABELS 1 2 EUR ...
Page 17: ...LOCATION OF IMPORTANT LABELS 1 3 AUS NZL ZAF ...
Page 41: ...MULTI FUNCTION DISPLAY 1 27 ...
Page 78: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25 ...
Page 80: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 ...
Page 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 ...
Page 84: ...CABLE ROUTING DIAGRAM 2 31 EAS2GB7073 CABLE ROUTING DIAGRAM ...
Page 86: ...CABLE ROUTING DIAGRAM 2 33 ...
Page 88: ...CABLE ROUTING DIAGRAM 2 35 ...
Page 90: ...CABLE ROUTING DIAGRAM 2 37 ...
Page 92: ...CABLE ROUTING DIAGRAM 2 39 ...
Page 94: ...CABLE ROUTING DIAGRAM 2 41 ...
Page 96: ...CABLE ROUTING DIAGRAM 2 43 ...
Page 98: ...CABLE ROUTING DIAGRAM 2 45 ...
Page 142: ...ELECTRICAL SYSTEM 3 42 ...
Page 152: ...CHASSIS 4 9 ...
Page 162: ...FRONT WHEEL 5 8 1 1 ...
Page 226: ...CHAIN DRIVE 5 72 ...
Page 290: ...OIL PUMP AND BALANCER GEAR 6 61 a 2 10 b 2 9 1 b 5 3 a 4 10 5 9 3 E c d 6 7 8 8 b 6 ...
Page 310: ...TRANSMISSION 6 81 ...
Page 347: ...CHARGING SYSTEM 9 15 ...
Page 351: ...LIGHTING SYSTEM 9 19 ...
Page 359: ...COOLING SYSTEM 9 27 ...
Page 391: ...FUEL PUMP SYSTEM 9 59 ...
Page 394: ...ELECTRICAL COMPONENTS 9 62 12 11 10 2 3 1 6 7 4 5 8 9 ...
Page 396: ...ELECTRICAL COMPONENTS 9 64 EAS2GB7383 CHECKING THE SWITCHES 4 1 3 2 E B S E B E B E E B B ...
Page 414: ...ELECTRICAL COMPONENTS 9 82 ...
Page 425: ......
Page 426: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER ...