E
ELEC
–
+
7-5
Step
Procedure/Part name
Q
’
ty
Service points
11
Slant detection switch
1
NOTE:
Install the slant detection switch with the
“
UP
”
mark
a
facing upward.
12
Bolt
2
13
Fuse box assembly
1
14
Electrical box case
1
Reverse the disassembly steps for
assembly.
UP
4 N
·
m (0.4 kgf
·
m, 3.0 ft
·
Ib)
13 N
·
m (1.3 kgf
·
m, 9.6 ft
·
Ib)
LT
242
LT
242
A
A
7
2
9
11
8
1
5
4
6
12
14
6
×
18 mm
8
×
25 mm
9
3
a
13
10
6
×
25 mm
5 N
·
m (0.5 kgf
·
m, 3.7 ft
·
Ib)
Summary of Contents for WaveRunner FX SHO
Page 1: ...SERVICE MANUAL FX SHO WaveRunner F1W 28197 1K 11 FX Cruiser SHO LIT 18616 03 12 LIT186160312 ...
Page 58: ...1 53 E GEN INFO MEMO Technical tips ...
Page 82: ...2 23 E SPEC MEMO Cable and hose routing ...
Page 110: ...3 27 E CHK ADJ MEMO General ...
Page 243: ...5 118 E POWR 1 2 3 4 5 6 7 8 9 MEMO Cooling water ...
Page 275: ...6 30 E JET PUMP 1 2 3 4 5 6 7 8 9 MEMO Intermediate housing ...
Page 353: ...E ELEC 1 2 3 4 5 6 7 8 9 7 76 MEMO Indication system ...
Page 410: ...8 55 E HULL HOOD MEMO Deck and hull ...
Page 429: ...9 18 E TRBL ANLS 1 2 3 4 5 6 7 8 9 MEMO Engine unit trouble analysis ...
Page 431: ......
Page 432: ...YAMAHA MOTOR CORPORATION USA Printed in USA Jan 2008 0 0 1 CR E ...