4 - 77
ENG
CRANKCASE, CRANKSHAFT AND BALANCER
3. Tighten:
●
Lead guide
1
●
Clutch cable holder
2
●
Bolt (crankcase) [45 mm (1.8 in)]
3
●
Bolt (crankcase) [55 mm (2.2 in)]
4
●
Bolt (crankcase) [30 mm (1.2 in)]
5
NOTE:
●
Apply Quick gasket
®
(YAMAHA Bond
No.1215) on end of the crankcase bolts
[45 mm (1.8 in)]
3
, as shown.
●
Tighten the crankcase bolts in stage, using a
crisscross pattern.
Quick gasket
®
:
ACC-QUICK-GS-KT
YAMAHA Bond No.1215:
90890-85505
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
4. Check:
●
Crankshaft and transmission operation
Unsmooth operation
→
Repair.
5. Install:
●
Timing chain
1
●
Intake timing chain guide
2
●
Bolt (intake timing chain guide)
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
LT
Summary of Contents for TT-R125(S)
Page 49: ...GEN INFO MEMO...
Page 179: ...INSP ADJ MEMO...
Page 571: ...ELEC MEMO...
Page 585: ...ELEC MEMO...
Page 605: ...ELEC MEMO...
Page 608: ......
Page 609: ......