7-18
E
BRKT
POWER TRIM AND TILT UNIT
T
R
.
.
Locking bolt:
13 Nm (1.3 m • kg, 9.4 ft • lb)
5. Fit a new O-ring and the back-up ring to
the trim-piston, fit new O-rings and a
new oil-seal to the end-screw and install
the complete trim-piston in the cylinder.
Fill the cylinder with hydraulic fluid and
install and tighten the end-screw to the
specified torque.
1
O-ring
2
Back-up ring
ATF
(automatic transmission fluid)
T
R
.
.
Trim cylinder end screw:
70 Nm (7.0 m • kg, 50 ft • lb)
Cylinder end screw wrench:
YB-6175-1A/90890-6548
6. Install the down relief-valve and the
complete gear-pump with new O-rings,
tighten the screws and fit the shaft con-
nector and filter, then fill with hydraulic
fluid.
1
Down relief spring (L = 13 mm, D = 6.1 mm)
2
Down relief valve seat
3
O-rings
4
Gear pump
5
Washer
6
Washer
7
Screw (Use hexagon wrench)
8
Shaft connector
9
Filter
T
R
.
.
Gear pump mounting screw:
5 Nm (0.5 m • kg, 3.6 ft • lb)
Summary of Contents for 50G
Page 1: ...6H2 28197 Z9 11 SERVICE MANUAL 50G 60F 70B 75C 90A ...
Page 6: ......
Page 8: ......
Page 16: ...1 7 GEN INFO E SPECIAL TOOLS ...
Page 18: ...1 9 GEN INFO E SPECIAL TOOLS ...
Page 20: ......
Page 50: ......
Page 69: ......
Page 159: ......
Page 198: ......
Page 203: ......