7-25
E
BRKT
POWER TRIM AND TILT UNIT
1. Install the tilt-cylinder and the delivery
pipes.
1
Bushing
2
Tilt-cylinder
3
Lower mount pin
4
Delivery pipe
NOTE:
Feed oil into each pipe.
2. Install the manual-valve in the body
with new O-rings.
1
Snap ring
2
O-ring
3
Manual release screw
4
O-ring
5
Manual valve seat
6
Manual release spring (ø0.6 mm)
7
Adapter 1
8
Manual release spring (ø1.2 mm)
T
R
.
.
Lock nut (delivery pipe):
15 Nm (1.5 m • kg, 11 ft • lb)
T
R
.
.
Manual valve:
3 Nm (0.3 m • kg, 2.2 ft • lb)
3. Install a new O-ring on the shuttle-pis-
ton and insert the piston into the body,
then install the main valves with new O-
rings.
1
O-ring
2
Shuttle-piston
3
O-ring
4
O-ring
5
Main valve
T
R
.
.
Main valve:
11 Nm (1.1 m • kg, 8.0 ft • lb)
Summary of Contents for 50G
Page 1: ...6H2 28197 Z9 11 SERVICE MANUAL 50G 60F 70B 75C 90A ...
Page 6: ......
Page 8: ......
Page 16: ...1 7 GEN INFO E SPECIAL TOOLS ...
Page 18: ...1 9 GEN INFO E SPECIAL TOOLS ...
Page 20: ......
Page 50: ......
Page 69: ......
Page 159: ......
Page 198: ......
Page 203: ......