8-19
–
+
ELEC
E
ELECTRICAL ANALYSIS
50, 60, 70 hp
75, 80, 90 hp
Pulser coil
Output peak voltage (minimum)
W/R – W/B
r/min
Cranking
1,500
3,500
Open
Connect
V
4.5
2.5
6.5
10
Pulser coil
Output peak voltage (minimum)
W/R – W/B
r/min
Cranking
1,500
3,500
Open
Connect
V
7.0
5.0
14
20
4. Lighting coil output:
1)
Connect the tester to the lighting
coil as shown.
2)
Set the tester dial to specification.
3)
Start the engine.
4)
Measure the lighting coil output.
5)
If the output is beyond specification,
replace rectifier/regulator.
6)
If the output is below specification,
replace lighting coil.
50, 60, 70 hp
75, 80, 90 hp
Lighting coil
Output peak voltage (minimum)
G – G/W
r/min
Cranking
1,500
3,500
Open
Connect
V
8.5
8.0
25
25
Lighting coil
Output peak voltage (minimum)
G – G/W
r/min
Cranking
1,500
3,500
Open
Connect
V
10
11
25
25
Summary of Contents for 50G
Page 1: ...6H2 28197 Z9 11 SERVICE MANUAL 50G 60F 70B 75C 90A ...
Page 6: ......
Page 8: ......
Page 16: ...1 7 GEN INFO E SPECIAL TOOLS ...
Page 18: ...1 9 GEN INFO E SPECIAL TOOLS ...
Page 20: ......
Page 50: ......
Page 69: ......
Page 159: ......
Page 198: ......
Page 203: ......