CHK
ADJ
3-11
e. Measure the valve clearance again.
f. If the valve clearance is still out of specifica-
tion, repeat all of the valve clearance
adjustment steps until the specified clear-
ance is obtained.
6. Install:
cylinder head side cover
breather tube
cylinder head cover
air pipe
A.I.C.V outlet tube
ADJUSTING THE ENGINE IDLING SPEED
2. Start the engine and let it warm up for sev-
eral minutes.
3. Attach:
•
digital tachometer
ADJUSTING THE VALVE CLEARANCE/
ADJUSTING THE ENGINE IDLING SPEED
d. Hold the adjusting screw to prevent it from
moving and tighten the locknut to specifica-
tion.
T
R
.
.
Locknut:
9 Nm (0.9
m •
kg, 6.5 ft
•
lb)
T
R
.
.
Cylinder head cover bolt:
12 Nm (
1.2 m •
kg, 8.7 ft
•
lb)
T
R
.
.
Cylinder head cover bolt:
12 Nm (
1.2 m •
kg, 8.7 ft
•
lb)
T
R
.
.
Cylinder head side cover bolt:
12 Nm (
1.2 m •
kg, 8.7 ft
•
lb)
(to the spark plug lead)
Inductive self-powered tachome-
ter
P/N. YU-8036-B
Engine tachometer
P/N. 90890-03113
1. Remove:
•
seat
•
left side cover and right side cover
Refer to “SEAT AND FENDERS”.
•
•
•
•
•
1