P/N: C11746310 REV. AB
June 2022
2
TABLE OF CONTENTS
1) SAFETY PRECAUTIONS .......................................................................................................................5
IMPORTANT INFORMATION AND WARNINGS .........................................................................................6
2) FABRICATION OF GIRDER(S) FOR BRIDGE BEAM WITH CAPPING CHANNEL
(AS REQUIRED) .....................................................................................................................................9
STEP 1: CUT GIRDER AND C-CHANNEL (AS REQUIRED) .....................................................................
10
STEP 2: CHECK CAMBER (AS REQUIRED) ..............................................................................................10
STEP 3: GIRDER AND C-CHANNEL WELDING AT END (AS REQUIRED) .............................................11
STEP 4: CLAMPING GIRDER AND C-CHANNEL (AS REQUIRED) .........................................................11
STEP 5: GIRDER AND C-CHANNEL WELDING (AS REQUIRED) ...........................................................12
STEP 6: CHECK CAMBER AFTER WELDING (AS REQUIRED) ..............................................................12
3) ASSEMBLING BRIDGE GIRDER TO UNDERHUNG END TRUCKS ....................................................13
3.A) PLAN VIEW ............................................................................................................................................14
3.B) DIMENSION DETAILS FOR GIRDER LENGTH CALCULATION ......................................................15
3.C) UNDERHUNG END TRUCK TYPES ....................................................................................................16
3.D) FORMED CHANNEL END TRUCK ......................................................................................................17
3.E) ROLLED CHANNEL END TRUCK ........................................................................................................18
STEP 1: BRIDGE GIRDER LENGTH (AS REQUIRED) .............................................................................19
STEP 2: MARKING CENTERLINE ON THE GIRDER (AS REQUIRED) ..................................................19
STEP 3: MARKING CENTERLINES AND HOLE LOCATIONS ON END TRUCK – UHFC .....................20
STEP 3A: MARKING CENTERLINES AND HOLE LOCATIONS ON END TRUCK – UHRC...................21
STEP 4: LOCATE & ALIGN END TRUCKS – UHFC ...................................................................................22
STEP 4A: LOCATE & ALIGN END TRUCKS – UHRC ................................................................................23
STEP 5: CHECK SQUARENESS BETWEEN END TRUCKS ....................................................................24
STEP 6: CHECK SPAN (CENTER TO CENTER) OF END TRUCKS ........................................................24
STEP 7: DRILLING HOLES ON END TRUCKS AND GIRDER FLANGE – UHFC ...................................25
STEP 7A: DRILLING HOLES ON END TRUCKS AND GIRDER FLANGE – UHRC ................................26
STEP 8: ASSEMBLE GIRDER TO END TRUCKS – UHFC........................................................................27
STEP 8A: ASSEMBLE GIRDER TO END TRUCKS – UHRC .....................................................................28
STEP 9: END STOP INSTALLATION ...........................................................................................................29
STEP 10: ASSEMBLING MOTOR AND GEAR REDUCER WITH END TRUCK ......................................30
STEP 10A: UHRC END TRUCK A4 DRIVE INSTALLATION ......................................................................31
STEP 11: ASSEMBLING GROOVE PIN WITH END TRUCK AND SUPPORT BRACKET ......................32
STEP 12: LOCATE AND DRILL HOLES FOR CROSS ARM SUPPORT ...................................................33
STEP 13: MOUNTING CROSS SHAFT SUPPORT ....................................................................................34
Summary of Contents for SHAW-BOX YK Series
Page 13: ...P N C11746310 REV AB June 2022 13 CHAPTER 3 ASSEMBLING BRIDGE GIRDER TO UNDERHUNG END TRUCKS...
Page 16: ...P N C11746310 REV AB June 2022 16 3 C UNDERHUNG END TRUCK TYPES...
Page 18: ...P N C11746310 REV AB June 2022 18 3 E ROLLED CHANNEL END TRUCK...
Page 22: ...P N C11746310 REV AB June 2022 22 STEP 4 LOCATE ALIGN END TRUCKS UHFC...
Page 23: ...P N C11746310 REV AB June 2022 23 STEP 4A LOCATE ALIGN END TRUCKS UHRC...
Page 30: ...P N C11746310 REV AB June 2022 30 STEP 10 ASSEMBLING MOTOR AND GEAR REDUCER WITH END TRUCK...
Page 31: ...P N C11746310 REV AB June 2022 31 STEP 10A UHRC END TRUCK A4 DRIVE INSTALLATION...
Page 36: ...P N C11746310 REV AB June 2022 36 STEP 15 CHECKING HORIZONTAL ALIGNMENT OF THE CROSS SHAFT...
Page 37: ...P N C11746310 REV AB June 2022 37 STEP 16 ASSEMBLING COUPLING WITH CROSS SHAFT...
Page 38: ...P N C11746310 REV AB June 2022 38 CHAPTER 4 END STOP ASSEMBLY...
Page 40: ...P N C11746310 REV AB June 2022 40 CHAPTER 5 MOUNTING HOIST ON GIRDER...
Page 42: ...P N C11746310 REV AB June 2022 42 STEP 2 MOUNTING HOIST ON GIRDER...
Page 44: ...P N C11746310 REV AB June 2022 44 STEP 2 MOUNTING HOIST ON GIRDER...
Page 45: ...P N C11746310 REV AB June 2022 45 CHAPTER 6 FESTOON SYSTEM INSTALLATION...
Page 46: ...P N C11746310 REV AB June 2022 46 6 A PLAN VIEW...
Page 48: ...P N C11746310 REV AB June 2022 48 STEP 3 C RAIL MOUNTING...
Page 49: ...P N C11746310 REV AB June 2022 49 STEP 4 C RAIL JOINT ASSEMBLY...
Page 50: ...P N C11746310 REV AB June 2022 50 STEP 5 MOUNTING BRIDGE PANEL...
Page 51: ...P N C11746310 REV AB June 2022 51 STEP 6 END STOP ASSEMBLY...
Page 52: ...P N C11746310 REV AB June 2022 52 STEP 7 HOIST CABLE ASSEMBLY...
Page 53: ...P N C11746310 REV AB June 2022 53 STEP 8 CONTROL PENDANT CABLE ASSEMBLY...
Page 57: ...P N C11746310 REV AB June 2022 57 STEP 10 TOW ARM KIT INSTALLATION Y80 800...
Page 66: ...P N C11746310 REV AB June 2022 66 CHAPTER 7 RADIO CONTROL HORN INSTALLATION FOR FESTOON SYSTEM...