P/N: C11746310 REV. AB 

June 2022

62

STEP 15: 

BRIDGE MOTOR CABLE CONNECTION

 

 

 

 

 

 

 

 

 

 

 

   

 

WARNING

DO NOT UNPLUG CONNECTORS WHILE CIRCUIT 

IS ENERGIZED.

BEFORE PLUGGING IN CONNECTORS REMOVE 

POWER FROM SYSTEM.

Summary of Contents for SHAW-BOX YK Series

Page 1: ...P N C11746310 YK SK Y80 800 Series CRANE KIT ASSEMBLY INSTRUCTION MANUAL B UHSG ASSEMBLY INSTRUCTION MANUAL www columbusmckinnon com P N C11746310 REV AB June 2022...

Page 2: ...GIRDER LENGTH AS REQUIRED 19 STEP 2 MARKING CENTERLINE ON THE GIRDER AS REQUIRED 19 STEP 3 MARKING CENTERLINES AND HOLE LOCATIONS ON END TRUCK UHFC 20 STEP 3A MARKING CENTERLINES AND HOLE LOCATIONS ON...

Page 3: ...R 44 6 FESTOON SYSTEM INSTALLATION 45 6 A PLAN VIEW 46 STEP 1 CLAMPING CROSS ARM CONTROL BOX SUPPORT RAILS 47 STEP 2 SPACING FOR CROSS ARMS SUPPORT RAILS 47 STEP 3 C RAIL MOUNTING 48 STEP 4 C RAIL JOI...

Page 4: ...STEP 17 BRIDGE TRAVEL LIMIT SWITCH INSTALLATION 64 STEP 18 FESTOON RUNWAY CHECKING 65 STEP 19 ADDING CABLE TIES 65 7 RADIO CONTROL HORN INSTALLATION FOR FESTOON SYSTEM 66 STEP 1 CROSS ARM BRACKET INS...

Page 5: ...in death or serious injury and property damage Warning Indicates an imminently hazardous situation which if not avoided could result in death or serious injury and property damage Caution Indicates a...

Page 6: ...comply with applicable crane design and safety standards The crane designer crane manufacturer or user is responsible for finishing these additional items for compliance Refer to ASME B30 11 Safety St...

Page 7: ...ontrol panel nameplate 9 While performing electric repairs maintenance make sure that there is no load on the hook turn off the power supply switch and prevent unauthorized personnel from switching it...

Page 8: ...er source for lifting or lowering persons Never lift and move loads over personnel 9 Use warning signs and barriers on the floor beneath the crane or area where the hoist will be installed WARNING Dam...

Page 9: ...P N C11746310 REV AB June 2022 9 CHAPTER 2 FABRICATION OF GIRDER S FOR BRIDGE BEAM WITH CAPPING CHANNEL AS REQUIRED...

Page 10: ...to see if a capping channel is required CUT LENGTH TO BE DETERMINED BY SPAN LENGTH STEP 2 CHECK CAMBER AS REQUIRED WARNING Selection of structural steel beams must be verified by qualified engineer I...

Page 11: ...bly of beam and truck requires welding IT IS EXTREMELY IMPORTANT TO THE SAFETY OF THIS BRIDGE THAT THIS WELDING BE DONE BY A COMPETENT WELL TRAINED WELDER It is our strong recommendation that the weld...

Page 12: ...F GIRDER AT LIVE LOAD NOTICE Assembly of beam and truck requires welding IT IS EXTREMELY IMPORTANT TO THE SAFETY OF THIS BRIDGE THAT THIS WELDING BE DONE BY A COMPETENT WELL TRAINED WELDER It is our s...

Page 13: ...P N C11746310 REV AB June 2022 13 CHAPTER 3 ASSEMBLING BRIDGE GIRDER TO UNDERHUNG END TRUCKS...

Page 14: ...P N C11746310 REV AB June 2022 14 3 A PLAN VIEW NOTE CROSS SHAFT IS NOT REQUIRED IF DUAL ENDTRUCK MOTORS ARE PART OF YOUR CONFIGURATION...

Page 15: ...9 17 1 3 8 905368W1 905369W1 9 1 2 10 1 8 1 3 1 4 2 6 3 4 14 7 3 4 17 2 5 8 905368W2 905369W2 10 3 4 1 0 5 8 1 4 1 2 2 9 1 4 14 6 1 2 17 3 7 8 905368PT 905369PT 8 1 4 7 5 8 1 2 2 4 1 4 14 9 17 1 3 8 9...

Page 16: ...P N C11746310 REV AB June 2022 16 3 C UNDERHUNG END TRUCK TYPES...

Page 17: ...ations or modifications of equipment and use of non factory repair parts can lead to dangerous operation and injury TO AVOID INJURY DO NOT alter or modify equipment DO NOT use equipment to lift suppor...

Page 18: ...P N C11746310 REV AB June 2022 18 3 E ROLLED CHANNEL END TRUCK...

Page 19: ...MUM LENGTH OF THE SPAN MINUS 4 0 GIRDER LENGTH TO BE DETERMINED BY SPAN LENGTH STEP 2 MARKING CENTERLINE ON THE GIRDER AS REQUIRED Check your font configuration to see if a capping channel is required...

Page 20: ...HOLE LOCATIONS ON END TRUCK UHFC MARKING HOLE LOCATION CENTERLINES ON THE GIRDER REFER TO PLAN VIEW PAGE 14 FOR DIMENSIONAL CALCULATIONS FOR GIRDER BRIDGE GIRDER FLANGE WIDTH A 3 3 8 2 3 5 8 THRU 4 2...

Page 21: ...HOLE LOCATIONS ON END TRUCK UHRC MARKING HOLE LOCATION CENTERLINES ON THE GIRDER REFER TO PLAN VIEW PAGE 14 FOR DIMENSIONAL CALCULATIONS FOR GIRDER BRIDGE GIRDER FLANGE WIDTH A 3 3 8 2 3 5 8 THRU 4 2...

Page 22: ...P N C11746310 REV AB June 2022 22 STEP 4 LOCATE ALIGN END TRUCKS UHFC...

Page 23: ...P N C11746310 REV AB June 2022 23 STEP 4A LOCATE ALIGN END TRUCKS UHRC...

Page 24: ...KS FOR SQUARENESS BETWEEN END TRUCKS D1 D2 1 32 D1 D2 DIAGONAL MEASUREMENTS STEP 6 CHECK SPAN CENTER TO CENTER OF END TRUCKS NOTICE The crane builder and user are responsible for marking the crane and...

Page 25: ...P N C11746310 REV AB June 2022 25 STEP 7 DRILLING HOLES ON END TRUCKS AND GIRDER FLANGE UHFC RATED LOAD TONS HOLE DIAMETER D BOLT DIAMETER 3 TON KIT 41 64 5 8 5 TON KIT 49 64 3 4...

Page 26: ...P N C11746310 REV AB June 2022 26 STEP 7A DRILLING HOLES ON END TRUCKS AND GIRDER FLANGE UHRC RATED LOAD TONS HOLE DIAMETER D BOLT DIAMETER 3 TON KIT 41 64 5 8 5 TON KIT 49 64 3 4...

Page 27: ...RFACES ARE BROUGHT INTO FULL CONTACT WITH EACH OTHER THEN MAKE A FINAL 1 2 TURN ON ALL BOLTS AND NUTS CAUTION DO NOT SUBSTITUTE STANDARD BOLTS AND NUTS FOR THE SPECIAL TRUCK CONNECTING BOLTS AND NUTS...

Page 28: ...URFACES ARE BROUGHT INTO FULL CONTACT WITH EACH OTHER THEN MAKE A FINAL 1 2 TURN ON ALL BOLTS AND NUTS CAUTION DO NOT SUBSTITUTE STANDARD BOLTS AND NUTS FOR THE SPECIAL TRUCK CONNECTING BOLTS AND NUTS...

Page 29: ...TO AVOID INJURY AND DAMAGE INSTALL END STOPS ON BOTH ENDS OF BEAMS TO PREVENT HOIST TROLLEY FROM RUNNING OFF END OF BEAM BRIDGE BEAM FLANGE WIDTH A TROLLEY STOP ANGLE SIZE 4 REQ D B C D 3 3 8 2 3 x 3...

Page 30: ...P N C11746310 REV AB June 2022 30 STEP 10 ASSEMBLING MOTOR AND GEAR REDUCER WITH END TRUCK...

Page 31: ...P N C11746310 REV AB June 2022 31 STEP 10A UHRC END TRUCK A4 DRIVE INSTALLATION...

Page 32: ...AB June 2022 32 STEP 11 ASSEMBLING GROOVE PIN WITH END TRUCK AND SUPPORT BRACKET IT IS ALLOWABLE TO USE A DRIVE ON EACH TRUCK AND ELIMINATE THE CROSS SHAFT IN THIS CASE THE UPCOMING STEPS 12 13 14 15...

Page 33: ...RT REFER TO PLAN VIEW PAGE 14 FOR NUMBER OF CROSS ARMS AND ITS POSITION DIMENSION DETAILS CROSS ARM SUPPORTS NOT REQUIRED IF YOUR CONFIGURATION INCLUDES DUAL ENDTRUCK MOTORS YOU MAY SKIP TO PAGE 37 RA...

Page 34: ...P N C11746310 REV AB June 2022 34 STEP 13 MOUNTING CROSS SHAFT SUPPORT LOOSELY BOLT THE CROSS SHAFT SUPPORTS TO THE BRIDGE BEAM...

Page 35: ...P N C11746310 REV AB June 2022 35 STEP 14 MOUNTING CROSS SHAFT BEARING AND COUPLING ON CROSS SHAFT SUPPORT...

Page 36: ...P N C11746310 REV AB June 2022 36 STEP 15 CHECKING HORIZONTAL ALIGNMENT OF THE CROSS SHAFT...

Page 37: ...P N C11746310 REV AB June 2022 37 STEP 16 ASSEMBLING COUPLING WITH CROSS SHAFT...

Page 38: ...P N C11746310 REV AB June 2022 38 CHAPTER 4 END STOP ASSEMBLY...

Page 39: ...T LB WARNING Trolley stops clip angles or end stop assemblies must be installed on both ends of the bridge beam to prevent hoist trolley from running off the end of the beam which could result in inju...

Page 40: ...P N C11746310 REV AB June 2022 40 CHAPTER 5 MOUNTING HOIST ON GIRDER...

Page 41: ...REV AB June 2022 41 YK SK HOIST INSTALLATION STEP 1 PREPARATION FOR MOUNTING HOIST ON GIRDER CAUTION Prior to installing the hoist check for any damage to the hoist during shipment DO NOT install a d...

Page 42: ...P N C11746310 REV AB June 2022 42 STEP 2 MOUNTING HOIST ON GIRDER...

Page 43: ...P N C11746310 REV AB June 2022 43 Y80 800 HOIST INSTALLATION STEP 1 PREPARATION FOR MOUNTING HOIST ON GIRDER...

Page 44: ...P N C11746310 REV AB June 2022 44 STEP 2 MOUNTING HOIST ON GIRDER...

Page 45: ...P N C11746310 REV AB June 2022 45 CHAPTER 6 FESTOON SYSTEM INSTALLATION...

Page 46: ...P N C11746310 REV AB June 2022 46 6 A PLAN VIEW...

Page 47: ...ne 2022 47 STEP 1 CLAMPING CROSS ARM CONTROL BOX SUPPORT RAILS STEP 2 SPACING FOR CROSS ARMS SUPPORT RAILS WARNING Check for any damage to the crane kit components during shipment DO NOT install damag...

Page 48: ...P N C11746310 REV AB June 2022 48 STEP 3 C RAIL MOUNTING...

Page 49: ...P N C11746310 REV AB June 2022 49 STEP 4 C RAIL JOINT ASSEMBLY...

Page 50: ...P N C11746310 REV AB June 2022 50 STEP 5 MOUNTING BRIDGE PANEL...

Page 51: ...P N C11746310 REV AB June 2022 51 STEP 6 END STOP ASSEMBLY...

Page 52: ...P N C11746310 REV AB June 2022 52 STEP 7 HOIST CABLE ASSEMBLY...

Page 53: ...P N C11746310 REV AB June 2022 53 STEP 8 CONTROL PENDANT CABLE ASSEMBLY...

Page 54: ...P N C11746310 REV AB June 2022 54 YK SK TOW ARM STEP 9 TOW ARM KIT PREPARATION TOW ARM ADJUSTMENTS LEFT ISO VIEW RIGHT ISO VIEW...

Page 55: ...P N C11746310 REV AB June 2022 55 Y80 800 TOW ARM STEP 9 TOW ARM KIT PREPARATION TOW ARM ADJUSTMENTS LEFT ISO VIEW RIGHT ISO VIEW...

Page 56: ...Alterations or modifications of equipment and use of non factory repair parts can lead to dangerous operation and injury TO AVOID INJURY DO NOT alter or modify equipent DO NOT use equipment to lift s...

Page 57: ...P N C11746310 REV AB June 2022 57 STEP 10 TOW ARM KIT INSTALLATION Y80 800...

Page 58: ...P N C11746310 REV AB June 2022 58 STEP 11 CABLE TRAY INSTALLATION NOTE WIRE TRAY IS ONLY INCLUDED WITH YK SK PRODUCTS...

Page 59: ...P N C11746310 REV AB June 2022 59 STEP 12 PLACING FESTOON CABLES ON CABLE TRAY NOTE WIRE TRAY IS ONLY INCLUDED WITH YK SK PRODUCTS...

Page 60: ...13 FESTOON CABLE CONNECTION DANGER Disconnect power and lockout disconnecting means before connecting power supply to hoist WARNING DO NOT UNPLUG CONNECTORS WHILE CIRCUIT IS ENERGIZED BEFORE PLUGGING...

Page 61: ...P N C11746310 REV AB June 2022 61 STEP 14 PUSH BUTTON PENDANT ASSEMBLY WARNING DO NOT UNPLUG CONNECTORS WHILE CIRCUIT IS ENERGIZED BEFORE PLUGGING IN CONNECTORS REMOVE POWER FROM SYSTEM...

Page 62: ...P N C11746310 REV AB June 2022 62 STEP 15 BRIDGE MOTOR CABLE CONNECTION WARNING DO NOT UNPLUG CONNECTORS WHILE CIRCUIT IS ENERGIZED BEFORE PLUGGING IN CONNECTORS REMOVE POWER FROM SYSTEM...

Page 63: ...trolley frame and bridge frame shall not be considered electrically grounded through the bridge and trolley wheels and its respective tracks A fourth runway conductor and collector shall be provided...

Page 64: ...CONNECTORS WHILE CIRCUIT IS ENERGIZED BEFORE PLUGGING IN CONNECTORS REMOVE POWER FROM SYSTEM WARNING Damage to the hoist a dropped load and injury may result if limit switches fail due to improper us...

Page 65: ...e in accordance with instructions furnished with the HOIST and TROLLEY before turning on the power WARNING Trolley stops clip angles or end stop assemblies must be installed on both ends of the bridge...

Page 66: ...P N C11746310 REV AB June 2022 66 CHAPTER 7 RADIO CONTROL HORN INSTALLATION FOR FESTOON SYSTEM...

Page 67: ...N C11746310 REV AB June 2022 67 STEP 1 CROSS ARM BRACKET INSTALLATION FOR RADIO CONTROL NOTE MOUNTING BRACKET AND CROSS ARM ONLY INCLUDED WITH YK SK PRODUCTS RADIO CONTROL SYSTEM BRACKET INSTALLATION...

Page 68: ...P N C11746310 REV AB June 2022 68 STEP 2 RADIO CONTROL SYSTEM INSTALLATION WARNING DO NOT UNPLUG CONNECTORS WHILE CIRCUIT IS ENERGIZED BEFORE PLUGGING IN CONNECTORS REMOVE POWER FROM SYSTEM...

Page 69: ...P N C11746310 REV AB June 2022 69 STEP 3 HORN INSTALLATION INTERNAL EXTERNAL DANGER Disconnect power and lockout disconnecting means before installing internal or external horn...

Page 70: ...P N C11746310 REV AB June 2022 70 NOTES...

Page 71: ...WITH RESPECT TO THE GOODS OR ANY REPLACEMENT PARTS WHETHER EXPRESSED OR IMPLIED INCLUDING ANY WARRANTIES OF MERCHANTABILITY FITNESS FOR A PARTICULAR PURPOSE QUALITY AND OR THOSE ARISING BY STATUTE OR...

Reviews: