![Yale SHAW-BOX YK Series Assembly & Instruction Manual Download Page 7](http://html1.mh-extra.com/html/yale/shaw-box-yk-series/shaw-box-yk-series_assembly-and-instruction-manual_3108514007.webp)
P/N: C11746310 REV. AB
June 2022
7
9
Read and observe the instructions and warnings contained in this manual. Read and
observe any instructions and warning tags attached to the hoist.
9
Check for any damage to the components during shipment. If any damage has occurred,
place a claim with the carrier. DO NOT install a damaged components.
9
Check wire rope for damage and proper spooling on the drum. Be sure rope is properly
seated in drum grooves and sheaves. Tightly secure both of the rope ends.
9
After each rope replacement as well as after repair and reassembling of the electric hoist,
check the phasing and direction of operation. Verify the hook position of all limit switches
per the hoist manual.
9
Be certain that power supply to the bridge control panel has the same voltage, frequency,
and phase specified on the bridge control panel nameplate.
9
While performing electric repairs/maintenance, make sure that there is no load on the hook;
turn off the power supply switch and prevent unauthorized personnel from switching it on.
9
Check the loading hook for cracks and deformations. Verify the proper operation of the
release latch.
9
The bridge frame shall not be considered electrically grounded through the end truck
wheels and its respective tracks. A separate runway bonding conductor must be provided.
WARNING
Hazardous voltages are present in the control enclosure, other electrical components, and
connections between these components.
Before performing any mechanical or electrical maintenance on the equipment, disconnect the
main switch supplying power to the equipment and implement lockout/tagout procedure. Refer to
ANSI Z244.1, personnel protection - lockout/tagout of energy sources.
DO NOT operate the equipment without control enclosure cover or covers in place.
Only trained and competent personnel should inspect and repair this equipment.
Summary of Contents for SHAW-BOX YK Series
Page 13: ...P N C11746310 REV AB June 2022 13 CHAPTER 3 ASSEMBLING BRIDGE GIRDER TO UNDERHUNG END TRUCKS...
Page 16: ...P N C11746310 REV AB June 2022 16 3 C UNDERHUNG END TRUCK TYPES...
Page 18: ...P N C11746310 REV AB June 2022 18 3 E ROLLED CHANNEL END TRUCK...
Page 22: ...P N C11746310 REV AB June 2022 22 STEP 4 LOCATE ALIGN END TRUCKS UHFC...
Page 23: ...P N C11746310 REV AB June 2022 23 STEP 4A LOCATE ALIGN END TRUCKS UHRC...
Page 30: ...P N C11746310 REV AB June 2022 30 STEP 10 ASSEMBLING MOTOR AND GEAR REDUCER WITH END TRUCK...
Page 31: ...P N C11746310 REV AB June 2022 31 STEP 10A UHRC END TRUCK A4 DRIVE INSTALLATION...
Page 36: ...P N C11746310 REV AB June 2022 36 STEP 15 CHECKING HORIZONTAL ALIGNMENT OF THE CROSS SHAFT...
Page 37: ...P N C11746310 REV AB June 2022 37 STEP 16 ASSEMBLING COUPLING WITH CROSS SHAFT...
Page 38: ...P N C11746310 REV AB June 2022 38 CHAPTER 4 END STOP ASSEMBLY...
Page 40: ...P N C11746310 REV AB June 2022 40 CHAPTER 5 MOUNTING HOIST ON GIRDER...
Page 42: ...P N C11746310 REV AB June 2022 42 STEP 2 MOUNTING HOIST ON GIRDER...
Page 44: ...P N C11746310 REV AB June 2022 44 STEP 2 MOUNTING HOIST ON GIRDER...
Page 45: ...P N C11746310 REV AB June 2022 45 CHAPTER 6 FESTOON SYSTEM INSTALLATION...
Page 46: ...P N C11746310 REV AB June 2022 46 6 A PLAN VIEW...
Page 48: ...P N C11746310 REV AB June 2022 48 STEP 3 C RAIL MOUNTING...
Page 49: ...P N C11746310 REV AB June 2022 49 STEP 4 C RAIL JOINT ASSEMBLY...
Page 50: ...P N C11746310 REV AB June 2022 50 STEP 5 MOUNTING BRIDGE PANEL...
Page 51: ...P N C11746310 REV AB June 2022 51 STEP 6 END STOP ASSEMBLY...
Page 52: ...P N C11746310 REV AB June 2022 52 STEP 7 HOIST CABLE ASSEMBLY...
Page 53: ...P N C11746310 REV AB June 2022 53 STEP 8 CONTROL PENDANT CABLE ASSEMBLY...
Page 57: ...P N C11746310 REV AB June 2022 57 STEP 10 TOW ARM KIT INSTALLATION Y80 800...
Page 66: ...P N C11746310 REV AB June 2022 66 CHAPTER 7 RADIO CONTROL HORN INSTALLATION FOR FESTOON SYSTEM...