P/N: C11746310 REV. AB
June 2022
8
9
If hoist has a trolley, check that the crane bridge beam is level, straight, and clean. Check
that trolley stops are installed, or install trolley stops, at the open end or ends of the beam
to prevent the trolley from traveling off the beam. Avoid using trolley stops that engage
trolley wheels. Check that trolley stops will prevent overhanging parts of the hoist and
trolley from interfering with other equipment beyond the ends of the beam.
9
Daily, before starting work, check the operation of the brake and the limit switch.
9
Never use a limit switch as an operational switches.
9
Do not leave the lifted load out of sight.
9
Do not exceed the rated capacity.
9
Do not lift loads at an angle and do not drag them.
9
Do not try to detach firmly fixed loads (for example, loads frozen to the ground).
9
Do not change or modify the electric diagram. Do not use the pushbuttons and limit
switches for other purposes other than those mentioned in this manual.
9
Equipment covered herein is not designed or suitable as a power source for lifting or
lowering persons. Never lift and move loads over personnel.
9
Use warning signs and barriers on the floor beneath the crane or area where the hoist will
be installed.
WARNING
Damage to the hoist, a droped load, and injury may result if limit switches fail due to improper use.
Under normal operating conditions,stop hoist travel before engaging limit switches. Limit switches
are safety devices and should not be used as normal opertating control.
WARNING
Only qualified personnel with proper supervision shall install the hoist on the monorail and
perform the final pre-operation inspection.
Before installing, removing, inspecting, or performing any maintenance on a hoist, the main switch
shall be de-energized. Lock and tag the main switch in the de-energized position in accordance
with ANSI Z244.1.
Follow other maintenance procedures outlined in the manual and applicable ASME B30 volumes.
Additional WARNINGS are listed in various portions of this manual. Personnel shall read and
follow these WARNINGS. Failure to read and comply with these WARNINGS as well as other
instructions or any limitations noted in this manual and applicable ASME B30 volumes could
result in serious bodily injury or death, and/or property damage.
Summary of Contents for SHAW-BOX YK Series
Page 13: ...P N C11746310 REV AB June 2022 13 CHAPTER 3 ASSEMBLING BRIDGE GIRDER TO UNDERHUNG END TRUCKS...
Page 16: ...P N C11746310 REV AB June 2022 16 3 C UNDERHUNG END TRUCK TYPES...
Page 18: ...P N C11746310 REV AB June 2022 18 3 E ROLLED CHANNEL END TRUCK...
Page 22: ...P N C11746310 REV AB June 2022 22 STEP 4 LOCATE ALIGN END TRUCKS UHFC...
Page 23: ...P N C11746310 REV AB June 2022 23 STEP 4A LOCATE ALIGN END TRUCKS UHRC...
Page 30: ...P N C11746310 REV AB June 2022 30 STEP 10 ASSEMBLING MOTOR AND GEAR REDUCER WITH END TRUCK...
Page 31: ...P N C11746310 REV AB June 2022 31 STEP 10A UHRC END TRUCK A4 DRIVE INSTALLATION...
Page 36: ...P N C11746310 REV AB June 2022 36 STEP 15 CHECKING HORIZONTAL ALIGNMENT OF THE CROSS SHAFT...
Page 37: ...P N C11746310 REV AB June 2022 37 STEP 16 ASSEMBLING COUPLING WITH CROSS SHAFT...
Page 38: ...P N C11746310 REV AB June 2022 38 CHAPTER 4 END STOP ASSEMBLY...
Page 40: ...P N C11746310 REV AB June 2022 40 CHAPTER 5 MOUNTING HOIST ON GIRDER...
Page 42: ...P N C11746310 REV AB June 2022 42 STEP 2 MOUNTING HOIST ON GIRDER...
Page 44: ...P N C11746310 REV AB June 2022 44 STEP 2 MOUNTING HOIST ON GIRDER...
Page 45: ...P N C11746310 REV AB June 2022 45 CHAPTER 6 FESTOON SYSTEM INSTALLATION...
Page 46: ...P N C11746310 REV AB June 2022 46 6 A PLAN VIEW...
Page 48: ...P N C11746310 REV AB June 2022 48 STEP 3 C RAIL MOUNTING...
Page 49: ...P N C11746310 REV AB June 2022 49 STEP 4 C RAIL JOINT ASSEMBLY...
Page 50: ...P N C11746310 REV AB June 2022 50 STEP 5 MOUNTING BRIDGE PANEL...
Page 51: ...P N C11746310 REV AB June 2022 51 STEP 6 END STOP ASSEMBLY...
Page 52: ...P N C11746310 REV AB June 2022 52 STEP 7 HOIST CABLE ASSEMBLY...
Page 53: ...P N C11746310 REV AB June 2022 53 STEP 8 CONTROL PENDANT CABLE ASSEMBLY...
Page 57: ...P N C11746310 REV AB June 2022 57 STEP 10 TOW ARM KIT INSTALLATION Y80 800...
Page 66: ...P N C11746310 REV AB June 2022 66 CHAPTER 7 RADIO CONTROL HORN INSTALLATION FOR FESTOON SYSTEM...