Installation
DW/P
26
ba77278e01
01/2024
3.3
Starting the measuring operation
Prerequisite:
The system is started up.
The sample flow is set.
All sensors are displayed in the measured value display on the terminal of the
IQ S
ENSOR
N
ET
.
1.
Make the settings for sensors on the IQ S
ENSOR
N
ET
.
(see system operating manual of the IQ S
ENSOR
N
ET
).
2.
Calibrate the sensors (see operating manual of the MIQ/IDS).