The complete Liver Assist is shipped in separate cardboard packages. The device has to be
unpacked, checked and installed by an XVIVO authorized person.
•
Set the trolley in the correct position (figure 8).
•
Position the pump and thermo units on the trolley, the HA pump unit on the left side,
the PV pump unit on the right side (figure 1).
•
Secure each unit with 2 bolts to the trolley (34).
•
Attach the aluminum holder (33) for the disposable system to left and right-hand
side of the trolley and secure the holder using the screw clamp.
•
Connect supplied data cable to the Liver Assist units using the data connector on
the back panel of the Liver Assist (5) (17) (5).
•
Connect power cord to the IEC inlet located on the back panel of the thermo unit
(18).
•
Connect power cord with Y junction to both pump units and the thermo unit (4) (16).
•
Connect power cord to the mains with earth connection.
•
Connect the Liver Assist to the hospital potential equalization connector with an
equipotential cable to ensure the potential equalization of the Liver Assist with other
medical devices (see IEC 60601-1 for ME-systems).
•
Disinfect the thermo unit as described in section 4.2.
The mains should be easily accessible to disconnect the device from mains.
Do not replace the IEC power cord or fuses. This modification will void the warranty and
violates the conformity of the Liver Assist with the requirements of the Medical Device
Directive 93/42/EEC.
Do not block the air intake vents and air outlet vents of the thermo unit.