VESDA Pipe Network Installation Guide
VESDA by Xtralis
26
www.xtralis.com
5.3
Cabinet and Rack Detection
Legend
A
Retainer clips
B
Sampling hole
C
Equipment cabinets
D
Capillary tubes
E
Rigid drop pipe
F
Under floor void
Figure 5-15: In-cabinet sampling using capillaries & drop pipes
5.3.1
In-Cabinet Installation
In-Cabinet sampling uses capillary tubes, microbore or drop pipes to sample the air from within a cabinet,
such as a switching console or an equipment rack. A capillary tube or microbore can be inserted into the
cabinet either from the top of the cabinet, or from the under floor void.
Warning:
Ensure that the power is switched off prior to commencing work on the cabinet. Make sure that
there are no electrical wires that may be damaged while drilling the hole.
Caution:
Check to see that dust or debris such as metallic shavings from drilling the holes will not
damage the equipment.
In-Cabinet sampling installation from the top:
1. Determine the entry point into the cabinet - Drill an appropriate size hole in the cabinet top, or use an
existing cable entry port.
2. Install the sampling pipe using Tee adaptors where the capillary tubes or drop pipes are to be run to the
cabinet.
3. Attach appropriate sized reducing connection to the Tee.
4. Attach capillary tube or drop pipes to the reducing connector.
5. Run the capillary or the drop pipe into the cabinet.
6. Unless specified otherwise, insert the capillary tube or drop pipe just below the interior of the cabinet
top to a depth of 25 mm to 50 mm (1 to 2 inches).
7. Attach sampling point fitting to ensure the correct sampling hole size.
Note:
Microbore installations only require steps 1 and 5 to 7.
In-Cabinet sampling installation from under the floor:
Warning:
Ensure that the Power is switched off prior to commencing work on the cabinet. Make sure that
there are no electrical wires that may be damaged while drilling the hole.
Caution:
Check to see that dust or debris such as metallic shavings from drilling the holes will not
damage the equipment.
1. Determine the entry point into the cabinet - Drill an appropriate size hole in the cabinet floor, or use an
existing cable entry port.
2. Install a sampling pipe as per the guidelines for Floor Void Installation in Section 5.1.3 on page 19, but
do not drill sampling holes unless specified in the pipe network design or IDP specifications.
3. Use Tee adaptors where the capillary tubes or drop pipes need to be attached.
4. Fix appropriate sized reducing connection to the Tee.
Summary of Contents for VESDA E-Series
Page 1: ...VESDA Student Workbook Rev 8a 15SEP21...
Page 4: ...iv...
Page 14: ...VESDA Course Overview 1 10 VESDA Student Workbook Create Xtralis Account...
Page 20: ...VESDA Course Overview 1 16 VESDA Student Workbook...
Page 23: ...VESDA Products VESDA Student Workbook 2 3 ASD iVESDA ASD...
Page 24: ...VESDA Products 2 4 VESDA Student Workbook VESDA model comparison chart...
Page 32: ...VESDA Products 2 12 VESDA Student Workbook Industrial facilities Industrial facilities...
Page 33: ...VESDA Products VESDA Student Workbook 2 13 Solutions for all environments Detectors...
Page 56: ...Installation 3 4 VESDA Student Workbook IDP Installation Practices...
Page 68: ...Installation 3 16 VESDA Student Workbook...
Page 74: ...VESDAnet Connection 4 6 VESDA Student Workbook...
Page 218: ...VSC Software Installation A 4 VESDA Student Workbook...
Page 224: ...ASPIRE Software Installation B 6 VESDA Student Workbook...
Page 238: ...14...
Page 239: ...VESDA Pipe Network Design Guide February 2019 Document 10193_09 Part Number 30009...
Page 240: ......
Page 293: ...VESDA Pipe Network Installation Guide March 2019 Document 10255_08 Part Number 30008...
Page 294: ......
Page 333: ......
Page 334: ...VESDA Commissioning Guide December 2012 Document 10195_06 Part Number 30005...
Page 335: ......