08/2012
4-92
WorkCentre 5021/5019
ADJ 18.2.1, ADJ 18.2.2
Initial Issue
Repairs and Adjustments
ADJ 18.1.2 Edge Erase Value Adjustment
Purpose
To correct both (Rear/Front) sides, Lead Edge and Tail Edge erase values of the image.
NOTE: The IOT Lead Edge/Side Edge Registration must be adjusted.
Check
1.
Specify a Tray loaded with paper. Make a black copy without using any originals and leav-
ing the Platen Cover open.
2.
Check that the white sections of the Lead Edge, Tail Edge, and both Side Edges are 4
mm.
Adjustment
1.
Enter the CE Mode.
2.
Adjust the NVM until the white sections of the Lead Edge, Tail Edge, and both Side Edges
are 4 mm.
Increasing the setting value increases the amount of edge erase for the Lead Edge, Tail
Edge, and both Sides.
This setting affect all 4 sides equally and it is not possible to perform individual setting for
the Lead Edge only, etc.
3.
After adjustment, make another black copy without using any originals and leaving the
Platen Cover open.
4.
Adjust until the white sections of the Lead Edge, Tail Edge, and both Side Edges are 4
mm.
ADJ 18.2.1 Things to take note when replacing Important
Information Stored Components (ISC)
Purpose
After installation, any data that the customer has registered are very important. To lose or leak
the data would be an unforgivable offence. To gain the trust of customers, it is essential for CE
to be knowledgeable about the name of components that store these data. The CE must also
have full understanding on how to handle these components when replacing them.
Procedure
This product stores important data in the following components. Perform the operation accord-
ing to the following procedures.
NOTE: IBG) Collect/discard components according to the separately pre-determined proce-
dures.
Table 1 NVM List
Chain-Link
Name
Min
Initial
Max
Step
780-066
Edge Erase Copy Job
0
40
500
0.1mm
Table 1
Component
Name
Stored Information
Pre-replacement
operation
Post-replacement
operation
1
EEP ROM
(ESS/MCU
PWB)
•
Product Code
•
Serial Number
•
Copy Counter/
Print Counter
•
HFSI
Counter(IIT/IOT)
•
Machine Sys-
tem Parameter
To restore the set-
tings later, print the
reports.
When replacing the
PWB, remove the
EEP ROM from the
old PWB, and install
it to the new one.
Restore settings according
to the reports.
When replacing the PWB,
remove the EEP ROM from
the old PWB, and install it to
the new one.
2
EEP ROM
(NET I/F
PWB)
•
MAC Address
•
IP Address
•
Network Sys-
tem Parameter
To restore the set-
tings later, print the
reports.
When replacing the
PWB, remove the
EEP ROM from the
old PWB, and install
it to the new one.
Restore settings according
to the reports.
When replacing the PWB,
remove the EEP ROM from
the old PWB, and install it to
the new one.
Summary of Contents for WorkCentre 5019
Page 17: ...08 2012 2 6 WorkCentre 5021 5019 2 1 3 Initial Issue Status Indicator RAPs ...
Page 19: ...08 2012 2 8 WorkCentre 5021 5019 2 2 1 1 Initial Issue Status Indicator RAPs ...
Page 21: ...08 2012 2 10 WorkCentre 5021 5019 003 500 795 003 951 Initial Issue Status Indicator RAPs ...
Page 23: ...08 2012 2 12 WorkCentre 5021 5019 004 345 Initial Issue Status Indicator RAPs ...
Page 33: ...08 2012 2 22 WorkCentre 5021 5019 023 600 Initial Issue Status Indicator RAPs ...
Page 37: ...08 2012 2 26 WorkCentre 5021 5019 041 210 211 Initial Issue Status Indicator RAPs ...
Page 39: ...08 2012 2 28 WorkCentre 5021 5019 042 325 614 Initial Issue Status Indicator RAPs ...
Page 41: ...08 2012 2 30 WorkCentre 5021 5019 045 310 045 313 Initial Issue Status Indicator RAPs ...
Page 43: ...08 2012 2 32 WorkCentre 5021 5019 061 321 061 325 Initial Issue Status Indicator RAPs ...
Page 47: ...08 2012 2 36 WorkCentre 5021 5019 071 105 Initial Issue Status Indicator RAPs ...
Page 51: ...08 2012 2 40 WorkCentre 5021 5019 075 135 Initial Issue Status Indicator RAPs ...
Page 57: ...08 2012 2 46 WorkCentre 5021 5019 092 660 668 092 910 Initial Issue Status Indicator RAPs ...
Page 59: ...08 2012 2 48 WorkCentre 5021 5019 093 312 093 912 Initial Issue Status Indicator RAPs ...
Page 61: ...08 2012 2 50 WorkCentre 5021 5019 095 910 Initial Issue Status Indicator RAPs ...
Page 63: ...08 2012 2 52 WorkCentre 5021 5019 116 321 116 377 Initial Issue Status Indicator RAPs ...
Page 65: ...08 2012 2 54 WorkCentre 5021 5019 117 326 Initial Issue Status Indicator RAPs ...
Page 67: ...08 2012 2 56 WorkCentre 5021 5019 123 314 Initial Issue Status Indicator RAPs ...
Page 75: ...08 2012 2 64 WorkCentre 5021 5019 2 2 4 8 Initial Issue Status Indicator RAPs ...
Page 89: ...08 2012 3 14 WorkCentre 5021 5019 IQ15 Initial Issue Image Quality ...
Page 106: ...08 2012 4 4 WorkCentre 5021 5019 4 1 Initial Issue Disassembly Assembly and Adjustment ...
Page 116: ...08 2012 4 14 WorkCentre 5021 5019 REP 1 6 1 Initial Issue Repairs and Adjustments ...
Page 118: ...08 2012 4 16 WorkCentre 5021 5019 REP 2 1 1 Initial Issue Repairs and Adjustments ...
Page 122: ...08 2012 4 20 WorkCentre 5021 5019 REP 4 1 1 Initial Issue Repairs and Adjustments ...
Page 124: ...08 2012 4 22 WorkCentre 5021 5019 REP 6 1 1 Initial Issue Repairs and Adjustments ...
Page 126: ...08 2012 4 24 WorkCentre 5021 5019 REP 7 1 1 Initial Issue Repairs and Adjustments ...
Page 130: ...08 2012 4 28 WorkCentre 5021 5019 REP 8 2 1 REP 8 2 2 Initial Issue Repairs and Adjustments ...
Page 162: ...08 2012 4 60 WorkCentre 5021 5019 REP 19 2 1 Initial Issue Repairs and Adjustments ...
Page 190: ...08 2012 4 88 WorkCentre 5021 5019 ADJ 1 3 2 Initial Issue Repairs and Adjustments ...
Page 192: ...08 2012 4 90 WorkCentre 5021 5019 ADJ 8 1 1 Initial Issue Repairs and Adjustments ...
Page 198: ...08 2012 4 96 WorkCentre 5021 5019 ADJ 18 2 2 Initial Issue Repairs and Adjustments ...
Page 209: ...08 2012 5 6 WorkCentre 5021 5019 5 1 4 5 1 5 Initial Issue Parts List ...
Page 267: ...08 2012 5 64 WorkCentre 5021 5019 99 8 Initial Issue Parts List ...
Page 293: ...08 2012 6 24 WorkCentre 5021 5019 6 1 28 6 1 29 Initial Issue General Procedures ...
Page 295: ...08 2012 6 26 WorkCentre 5021 5019 6 2 1 6 2 2 Initial Issue General Procedures ...
Page 299: ...08 2012 6 30 WorkCentre 5021 5019 6 3 1 3 Initial Issue General Procedures ...
Page 303: ...08 2012 6 34 WorkCentre 5021 5019 6 3 2 3 Initial Issue General Procedures ...
Page 305: ...08 2012 6 36 WorkCentre 5021 5019 6 3 3 Initial Issue General Procedures ...
Page 317: ...08 2012 6 48 WorkCentre 5021 5019 6 3 6 Initial Issue General Procedures ...
Page 319: ...08 2012 6 50 WorkCentre 5021 5019 6 3 7 Initial Issue General Procedures ...
Page 325: ...08 2012 6 56 WorkCentre 5021 5019 6 3 10 Initial Issue General Procedures ...
Page 327: ...08 2012 6 58 WorkCentre 5021 5019 6 3 11 Initial Issue General Procedures ...
Page 331: ...08 2012 6 62 WorkCentre 5021 5019 6 3 13 Initial Issue General Procedures ...
Page 335: ...08 2012 6 66 WorkCentre 5021 5019 6 3 14 Initial Issue General Procedures ...
Page 337: ...08 2012 6 68 WorkCentre 5021 5019 6 3 15 Initial Issue General Procedures ...
Page 347: ...08 2012 6 78 WorkCentre 5021 5019 6 3 17 Initial Issue General Procedures ...
Page 353: ...08 2012 6 84 WorkCentre 5021 5019 6 3 19 Initial Issue General Procedures ...
Page 355: ...08 2012 6 86 WorkCentre 5021 5019 6 3 20 Initial Issue General Procedures ...
Page 358: ...08 2012 6 89 WorkCentre 5021 5019 6 4 1 3 General Procedures Initial Issue ...
Page 359: ...08 2012 6 90 WorkCentre 5021 5019 6 4 1 3 Initial Issue General Procedures ...
Page 377: ...08 2012 6 108 WorkCentre 5021 5019 6 4 3 Initial Issue General Procedures ...
Page 393: ...08 2012 7 10 WorkCentre 5021 5019 7 1 2 Initial Issue Wiring Data ...
Page 415: ...08 2012 7 32 WorkCentre 5021 5019 4 5 Initial Issue Wiring Data ...
Page 423: ...08 2012 7 40 WorkCentre 5021 5019 CH2 1 Initial Issue Wiring Data ...
Page 427: ...08 2012 7 44 WorkCentre 5021 5019 CH3 3 Initial Issue Wiring Data ...
Page 429: ...08 2012 7 46 WorkCentre 5021 5019 CH4 1 Initial Issue Wiring Data ...
Page 437: ...08 2012 7 54 WorkCentre 5021 5019 CH5 7 Initial Issue Wiring Data ...