08/2012
2-17
WorkCentre 5021/5019
010-311, 010-320
Status Indicator RAPs
Initial Issue
010-311 Fusing Unit Center Thermistor Defect
BSD-ON:
CH10.2
An open circuit abnormality (the AD value of the STS is equivalent to the open circuit value) of
the Heat Roll Center Thermistor was detected.
Procedure
Turn OFF the power and disconnect the Heat Roll Center Thermistor connector
P/J600
. Mea-
sure the resistance between the Heat Roll Center Thermistor
J600
pin-1 and
J600
pin-2. Is
the resistance infinite?
Y
N
Reconnect the connector
P/J600
and measure the resistance between the ESS/MCU
PWB
J403
pin-1 and
J403
pin-2. Is the resistance infinite?
Y
N
Replace the ESS/MCU PWB. (
PL 18.1
)
Check the following connections for open circuits and poor contacts.
•
Between ESS/MCU PWB
J403
-1 and Heat Roll Center Thermistor
P600
-4
•
Between ESS/MCU PWB
J403
-2 and Heat Roll Center Thermistor
P600
-3
Replace the Fusing Unit. (
PL 7.1
)
010-312 Fusing Unit Rear Thermistor Defect
BSD-ON:
CH10.2
An open circuit abnormality (the AD value of the STS is equivalent to the open circuit value) of
the Heat Roll Rear Thermistor was detected.
Procedure
Turn OFF the power and disconnect the Heat Roll Rear Thermistor connector
P/J600
. Mea-
sure the resistance between the Heat Roll Rear Thermistor
J600
pin-3 and
J600
pin-4. Is the
resistance infinite?
Y
N
Reconnect the connector
P/J600
and measure the resistance between the ESS/MCU
PWB
J403
pin-3 and
J403
pin-4. Is the resistance infinite?
Y
N
Replace the ESS/MCU PWB. (
PL 18.1
)
Check the following connections for open circuits and poor contacts.
•
Between ESS/MCU PWB
J403
-3 and Heat Roll Rear Thermistor
P600
-2
•
Between ESS/MCU PWB
J403
-4 and Heat Roll Rear Thermistor
P600
-1
Replace the Fusing Unit. (
PL 7.1
)
010-320 Over Heat Temperature Fail
BSD-ON:
CH10.2
,
CH10.1
A high temperature error was detected at the Center Thermistor (245 degrees C or higher) or
the Rear Thermistor (270 degrees C or higher).
NOTE: To clear this Fail, first remove the cause, next clear the value of NVM [744-040] (Over
Heat Temp Fail) to '0', and then turn the power OFF then ON. The relationship between the dis-
played value and the Thermistor that detected the high temperature error is as follows:
•
0: Normal
•
1: High Temperature Error of Heat Roll Center Thermistor
•
2: High Temperature Error of Heat Roll Rear Thermistor
Cause/Action
Check the following:
•
The Center Thermistor or the Rear Thermistor for dropped parts, sensor contamination,
and foreign substances blocking the sensor.
•
The Heat Roll for wound up, stuck paper.
•
The Heat Roll Center Thermistor (Analog Monitor [010-050]) for operation failure.
•
The Heat Roll Rear Thermistor (Analog Monitor [010-051]) for operation failure.
•
The Heater Rod for operation failure.
If no problem is found, replace the following parts in sequence:
•
Fusing Unit (
PL 7.1
)
•
LVPS (
PL 18.1
)
•
ESS/MCU PWB (
PL 18.1
)
010-327 Fusing Unit On Time Fail
BSD-ON:
CH10.2
,
CH10.1
Any of the following was detected:
•
The Heater Rod did not turn OFF within the specified time after the Heater Rod On.
•
After power ON, the temperature of the Fusing Unit does not reach the specified value
within the specified time.
Cause/Action
Check the following:
•
The Heater Rod for operation failure.
•
The connection between the LVPS
J511
and the Fusing Unit
P10
for open circuit and
poor contact
•
The Center Thermistor for dropped parts, sensor contamination, and foreign substances
blocking the sensor.
•
The Heat Roll for wound up, stuck paper.
Summary of Contents for WorkCentre 5019
Page 17: ...08 2012 2 6 WorkCentre 5021 5019 2 1 3 Initial Issue Status Indicator RAPs ...
Page 19: ...08 2012 2 8 WorkCentre 5021 5019 2 2 1 1 Initial Issue Status Indicator RAPs ...
Page 21: ...08 2012 2 10 WorkCentre 5021 5019 003 500 795 003 951 Initial Issue Status Indicator RAPs ...
Page 23: ...08 2012 2 12 WorkCentre 5021 5019 004 345 Initial Issue Status Indicator RAPs ...
Page 33: ...08 2012 2 22 WorkCentre 5021 5019 023 600 Initial Issue Status Indicator RAPs ...
Page 37: ...08 2012 2 26 WorkCentre 5021 5019 041 210 211 Initial Issue Status Indicator RAPs ...
Page 39: ...08 2012 2 28 WorkCentre 5021 5019 042 325 614 Initial Issue Status Indicator RAPs ...
Page 41: ...08 2012 2 30 WorkCentre 5021 5019 045 310 045 313 Initial Issue Status Indicator RAPs ...
Page 43: ...08 2012 2 32 WorkCentre 5021 5019 061 321 061 325 Initial Issue Status Indicator RAPs ...
Page 47: ...08 2012 2 36 WorkCentre 5021 5019 071 105 Initial Issue Status Indicator RAPs ...
Page 51: ...08 2012 2 40 WorkCentre 5021 5019 075 135 Initial Issue Status Indicator RAPs ...
Page 57: ...08 2012 2 46 WorkCentre 5021 5019 092 660 668 092 910 Initial Issue Status Indicator RAPs ...
Page 59: ...08 2012 2 48 WorkCentre 5021 5019 093 312 093 912 Initial Issue Status Indicator RAPs ...
Page 61: ...08 2012 2 50 WorkCentre 5021 5019 095 910 Initial Issue Status Indicator RAPs ...
Page 63: ...08 2012 2 52 WorkCentre 5021 5019 116 321 116 377 Initial Issue Status Indicator RAPs ...
Page 65: ...08 2012 2 54 WorkCentre 5021 5019 117 326 Initial Issue Status Indicator RAPs ...
Page 67: ...08 2012 2 56 WorkCentre 5021 5019 123 314 Initial Issue Status Indicator RAPs ...
Page 75: ...08 2012 2 64 WorkCentre 5021 5019 2 2 4 8 Initial Issue Status Indicator RAPs ...
Page 89: ...08 2012 3 14 WorkCentre 5021 5019 IQ15 Initial Issue Image Quality ...
Page 106: ...08 2012 4 4 WorkCentre 5021 5019 4 1 Initial Issue Disassembly Assembly and Adjustment ...
Page 116: ...08 2012 4 14 WorkCentre 5021 5019 REP 1 6 1 Initial Issue Repairs and Adjustments ...
Page 118: ...08 2012 4 16 WorkCentre 5021 5019 REP 2 1 1 Initial Issue Repairs and Adjustments ...
Page 122: ...08 2012 4 20 WorkCentre 5021 5019 REP 4 1 1 Initial Issue Repairs and Adjustments ...
Page 124: ...08 2012 4 22 WorkCentre 5021 5019 REP 6 1 1 Initial Issue Repairs and Adjustments ...
Page 126: ...08 2012 4 24 WorkCentre 5021 5019 REP 7 1 1 Initial Issue Repairs and Adjustments ...
Page 130: ...08 2012 4 28 WorkCentre 5021 5019 REP 8 2 1 REP 8 2 2 Initial Issue Repairs and Adjustments ...
Page 162: ...08 2012 4 60 WorkCentre 5021 5019 REP 19 2 1 Initial Issue Repairs and Adjustments ...
Page 190: ...08 2012 4 88 WorkCentre 5021 5019 ADJ 1 3 2 Initial Issue Repairs and Adjustments ...
Page 192: ...08 2012 4 90 WorkCentre 5021 5019 ADJ 8 1 1 Initial Issue Repairs and Adjustments ...
Page 198: ...08 2012 4 96 WorkCentre 5021 5019 ADJ 18 2 2 Initial Issue Repairs and Adjustments ...
Page 209: ...08 2012 5 6 WorkCentre 5021 5019 5 1 4 5 1 5 Initial Issue Parts List ...
Page 267: ...08 2012 5 64 WorkCentre 5021 5019 99 8 Initial Issue Parts List ...
Page 293: ...08 2012 6 24 WorkCentre 5021 5019 6 1 28 6 1 29 Initial Issue General Procedures ...
Page 295: ...08 2012 6 26 WorkCentre 5021 5019 6 2 1 6 2 2 Initial Issue General Procedures ...
Page 299: ...08 2012 6 30 WorkCentre 5021 5019 6 3 1 3 Initial Issue General Procedures ...
Page 303: ...08 2012 6 34 WorkCentre 5021 5019 6 3 2 3 Initial Issue General Procedures ...
Page 305: ...08 2012 6 36 WorkCentre 5021 5019 6 3 3 Initial Issue General Procedures ...
Page 317: ...08 2012 6 48 WorkCentre 5021 5019 6 3 6 Initial Issue General Procedures ...
Page 319: ...08 2012 6 50 WorkCentre 5021 5019 6 3 7 Initial Issue General Procedures ...
Page 325: ...08 2012 6 56 WorkCentre 5021 5019 6 3 10 Initial Issue General Procedures ...
Page 327: ...08 2012 6 58 WorkCentre 5021 5019 6 3 11 Initial Issue General Procedures ...
Page 331: ...08 2012 6 62 WorkCentre 5021 5019 6 3 13 Initial Issue General Procedures ...
Page 335: ...08 2012 6 66 WorkCentre 5021 5019 6 3 14 Initial Issue General Procedures ...
Page 337: ...08 2012 6 68 WorkCentre 5021 5019 6 3 15 Initial Issue General Procedures ...
Page 347: ...08 2012 6 78 WorkCentre 5021 5019 6 3 17 Initial Issue General Procedures ...
Page 353: ...08 2012 6 84 WorkCentre 5021 5019 6 3 19 Initial Issue General Procedures ...
Page 355: ...08 2012 6 86 WorkCentre 5021 5019 6 3 20 Initial Issue General Procedures ...
Page 358: ...08 2012 6 89 WorkCentre 5021 5019 6 4 1 3 General Procedures Initial Issue ...
Page 359: ...08 2012 6 90 WorkCentre 5021 5019 6 4 1 3 Initial Issue General Procedures ...
Page 377: ...08 2012 6 108 WorkCentre 5021 5019 6 4 3 Initial Issue General Procedures ...
Page 393: ...08 2012 7 10 WorkCentre 5021 5019 7 1 2 Initial Issue Wiring Data ...
Page 415: ...08 2012 7 32 WorkCentre 5021 5019 4 5 Initial Issue Wiring Data ...
Page 423: ...08 2012 7 40 WorkCentre 5021 5019 CH2 1 Initial Issue Wiring Data ...
Page 427: ...08 2012 7 44 WorkCentre 5021 5019 CH3 3 Initial Issue Wiring Data ...
Page 429: ...08 2012 7 46 WorkCentre 5021 5019 CH4 1 Initial Issue Wiring Data ...
Page 437: ...08 2012 7 54 WorkCentre 5021 5019 CH5 7 Initial Issue Wiring Data ...