Product overview
WorkCentre 5019/5021
User Guide
3-6
Power source
Switching the power on
The following describes how to switch the power on.
The machine takes approximately 30 seconds to warm up and to be ready to copy or print after the
power is turned on. It may take slightly longer than normal depending on the device configuration.
Switch the power off at the end of the day or when not using the machine for an extended period of
time.
1.
Press the power switch to the On position to switch the power on.
Notes
•
While the machine is warming up, the machine status diagram displays as shown in the
right image. The machine is not accessible while it’s warming up
•
Make sure that the power cable is connected to the machine and the wall outlet
properly..
Summary of Contents for WorkCentre 5019
Page 1: ...September 2012 702P00733 WorkCentre 5019 5021 User Guide...
Page 22: ...Before using the machine WorkCentre 5019 5021 User Guide 1 16...
Page 48: ...Product overview WorkCentre 5019 5021 User Guide 3 22...
Page 94: ...Scan WorkCentre 5019 5021 User Guide 6 8...
Page 98: ...Print WorkCentre 5019 5021 User Guide 7 4...
Page 118: ...Machine status WorkCentre 5019 5021 User Guide 9 6...
Page 168: ...Problem solving WorkCentre 5019 5021 User Guide 11 38...
Page 178: ...Appendix WorkCentre 5019 5021 User Guide 12 10...
Page 182: ...Index WorkCentre 5019 5021 User Guide iv...
Page 183: ......
Page 184: ......