![Xerox 5915 Service Manual Download Page 52](http://html1.mh-extra.com/html/xerox/5915/5915_service-manual_884767052.webp)
4-17
4. Optics
Section 4 Disassembly/Assembly/Adjustment
8. (Fig. 3): Move gently the Full/Half-Rate
Carriages toward their home positions by
rotating the Capstan Pulley shaft manually to
check the following:
•
The Half-Rate Carriage convex contacts
Block A’s at its front and rear.
•
Block B’s installed to the Full-Rate Carriage
contact the Left-Hand Frame at its front and
rear.
(Fig. 3)
Adjustment
Half-Rate Carriage Adjustment
1. (Fig. 4): Make the Half-Rate Carriage convex
contact (Front/Rear) Block A’s.
➀
. Loosen screws(2) for Front Capstan Pulley.
➁
. Adjust by rotating Capstan Pulley or Shaft.
NOTE
:
•
Do not remove Screw for Rear
Capstan Pulley.
➂
. Tighten Screws(2).
Reference
The standard tightening Torque is
0.5N
•
m(5kgf
•
cm).
(Fig. 4)
2. (Fig. 5): Remove the end play in the Drive
Shaft axis direction and tighten the screws for
the Capstan Pulley.
➀
. Insert 0.5mm Thickness Gauge between
Capstan Pulley and Bearing.
➁
. Push Capstan Pulley to front and Shaft to
rear and tighten screws(2).
(Fig. 5)
Full-Rate Carriage Adjustment
1. (Fig. 6): Make (Front/Rear) Block B’s installed
to the Carriage contact the Left-Hand
Frame.
➀
. Loosen the Carriage Wire Mounting Screw.
NOTE
:
•
For the adjustment of Rear Block B,
remove the Optical Cooling Fan.
.........………………………….. (4.1.2)
➁
. Adjust by moving the Carriage.
➂
. Tighten Screw.
(Fig. 6)
Summary of Contents for 5915
Page 4: ...Section 1 Service Procedure ...
Page 6: ...1 2 Section 1 Service Procedure 1 1 Precautions Intentional bank page ...
Page 9: ...Section 2 Troubleshooting ...
Page 12: ...2 3 Section 2 Troubleshooting Intentional blank page ...
Page 35: ...Section 4 Disassembly Assembly Adjustment ...
Page 37: ...4 2 Section 4 Disassembly Assembly Adjustment Intentional blank page ...
Page 76: ...Section 5 Parts List ...
Page 110: ...Section 6 GENERAL ...
Page 123: ...Section 7 Wiring Data ...
Page 130: ...7 7 Connector Configuration Section 7 WIRING DATA R H VIEW A A DETAILS TOP VIEW Fig 6 Fig 7 ...
Page 131: ...7 8 Section 7 Wiring Data Connector Configuration TOP VIEW Fig 8 BASE FRAME TOP VIEW Fig 9 ...
Page 132: ...Section 9 BSD Block Schematic Diagram ...
Page 135: ...9 3 1 1 STANDBY POWER Section 9 BSD Block Schematic Diagram ...
Page 136: ...9 4 Section 9 BSD Block Schematic Diagram 1 1 STANDBY POWER ...
Page 137: ...9 5 1 1 STANDBY POWER Section 9 BSD Block Schematic Diagram ...
Page 139: ...9 7 3 1 OPTICS Section 9 BSD Block Schematic Diagram ...
Page 141: ...9 9 4 PAPER SUPPLYING AND TRANSPORTATION Section 9 BSD Block Schematic Diagram ...
Page 143: ...9 11 5 XEROGRAPHICS COPY TRANSPORTATION AND FUSING Section 9 BSD Block Schematic Diagram ...