6-8
Section 6 General
6.5 Installation/ Removal
6.5.2 Removal
Removal as described in this Manual applies to
field clearance activity only
Perform the removal procedure in the reverse order
of installation.
Customer Service Engineers should check the final
destination of the machine prior to field clearance.
For removal, the following are required:
1. Category Check List
2. Sticker indicating M/C destination
3. Installation Procedure
4. Packaging Tapes and Clothes
5. Plastic Bag (Drum Cover)
Removal Procedure
1. Check if any consumable or wear parts require
replacement by referring to the service record
card. (See the “Trim” section of the Manual.)
Note
: If any parts are installed wrongly, correct,
before removal.
2. If any adjustment has been made based on
the customers desire, put it back to the original
status.
3. Perform Trim operation and clean inside of the
machine.
4. Turn on the power, make copies, and check
copy quality, paper feed and copy count.
5. Switch off the machine and unplug the power
cord.
6. Remove paper from the Paper Tray.
7. Remove the Copy Output Tray.
8. Remove the Tray Module and unplug the
connector from the Main Processor.
9. Clean the machine surroundings.
10. Enter relevant data in the service record card
and store it along with the Category Check
List.
11. Affix the return delivery sticker on the Top
Cover.
12. Place the Drum Cover for consumables on
the Platen Cover.
13. Log in the Service Report.
Summary of Contents for 5915
Page 4: ...Section 1 Service Procedure ...
Page 6: ...1 2 Section 1 Service Procedure 1 1 Precautions Intentional bank page ...
Page 9: ...Section 2 Troubleshooting ...
Page 12: ...2 3 Section 2 Troubleshooting Intentional blank page ...
Page 35: ...Section 4 Disassembly Assembly Adjustment ...
Page 37: ...4 2 Section 4 Disassembly Assembly Adjustment Intentional blank page ...
Page 76: ...Section 5 Parts List ...
Page 110: ...Section 6 GENERAL ...
Page 123: ...Section 7 Wiring Data ...
Page 130: ...7 7 Connector Configuration Section 7 WIRING DATA R H VIEW A A DETAILS TOP VIEW Fig 6 Fig 7 ...
Page 131: ...7 8 Section 7 Wiring Data Connector Configuration TOP VIEW Fig 8 BASE FRAME TOP VIEW Fig 9 ...
Page 132: ...Section 9 BSD Block Schematic Diagram ...
Page 135: ...9 3 1 1 STANDBY POWER Section 9 BSD Block Schematic Diagram ...
Page 136: ...9 4 Section 9 BSD Block Schematic Diagram 1 1 STANDBY POWER ...
Page 137: ...9 5 1 1 STANDBY POWER Section 9 BSD Block Schematic Diagram ...
Page 139: ...9 7 3 1 OPTICS Section 9 BSD Block Schematic Diagram ...
Page 141: ...9 9 4 PAPER SUPPLYING AND TRANSPORTATION Section 9 BSD Block Schematic Diagram ...
Page 143: ...9 11 5 XEROGRAPHICS COPY TRANSPORTATION AND FUSING Section 9 BSD Block Schematic Diagram ...