background image

 

12

 

 

EN 

Putting into operation 

Once the isometer has been connected and the connections have 
been  checked,  the  input  voltage  of  the  floating  system  can  be 
activated.  The  isometer  will  perform  a  self-test  (see  the 
"Automatic self-test" section). Next, the system is on standby and 
can, therefore, be used. 

 

 

OPER A T I ON A L

 

 

Self-test 

Automatic self-test 

The isometer will automatically run through a connection test and 
a self-test every time the current source is switched on. "TES" will 
be displayed on the display and all LEDs will light up. After 6 to 12 
seconds, the isometer will start up and only the ON LED will be lit 
if no errors have been detected. This self-test will, moreover, be 
performed every 24 hours. 

 

Manual self-test 

A test can also be performed manually. Functional and connection 
errors/faults will then be checked. Press the "test" button for 2 
seconds. If you continue to press this button, all the icons that are 
possible will be displayed on the display. If an error is found, all the 
LEDs will start to flash and an error code will be displayed on the 
display.  See  the  "Information  displayed"  section.  If  an  error 
message is displayed: switch off the current source, resolve the 
error  and  again  switch  on  the  inverter/generator.  The  self-test 
will again be performed. 

 

Insulation resistance 

The total insulation resistance of the system will be displayed on 
the display. The display will show > 1.0 M

 as standard. When 

the consumers are activated, the actual insulation resistance can 
be read. The deactivation of the isometer is adjusted to 10 k

 as 

standard.  
 

Reset after deactivation 

If the set value is exceeded, the isometer will disable the current 
source. If this should happen: 

Summary of Contents for ISO Series

Page 1: ...Nederlands ISO SERIES Ge bru i ksaanwijz in g P a g i n a 2 Users m an u al P a g e 8 G eb rau chs anw eisu ng Se i t e 1 4 NL EN DE...

Page 2: ...ron De modellen ISO 230 16C en ISO 230 25C zijn speciaal geschikt voor z g n combi s acculader en inverter in n of als er gewerkt wordt met een voorrangschakelaar omschakelbox tussen netspanning en in...

Page 3: ...iebewaker altijd direct aan op de inverter generator Dus voor eventuele overige randapparatuur zoals bijvoorbeeld een omschakelbox voor inverter netspanning Monteer de bekabelingen goed vast tegen cha...

Page 4: ...oor aansluiting met de vaste netspanning Sluit deze mains in aan op dezelfde netspanning ingang van de combi unit ofwel van de voorrang schakelaar zoals bijvoorbeeld de PTS 230 25 Zie schema op de vol...

Page 5: ...zijn gecontroleerd is kan de ingangspanning van het zwevend stelsel aangeschakeld worden De isolatiebewaker zal de zelftest doorlopen Hierna is het systeem klaar voor gebruik ISO 2 3 0 16 C en IS O 2...

Page 6: ...econstateerd worden dan gaan alle de led s knipperen en verschijnt er een foutcode in het display zie paragraaf weergaves display In geval van een foutmelding schakel de stroombron uit verhelp de fout...

Page 7: ...met het Smart Value service label van Xenteq Dit label geeft u extra voordelen en zekerheden op het gebied van service Lees meer hierover op onze website In geval van een defect kunt u het apparaat t...

Page 8: ...ransfer switch INSTALLATION Important Make sure the system is completely voltage free during the installation and connection The installation may only be carried out by qualified engineers Only one is...

Page 9: ...efore for any other peripherals such as for example a switch box for an inverter line voltage Mount the cabling correctly against the chassis or plating The input cable of the isometer can be connecte...

Page 10: ...l input for connection with the mains AC power Connect this mains in to the same AC input from the combi unit or to the mains input from the power transfer switch such as the PTS 230 25 See drawings n...

Page 11: ...11 EN ISO 2 3 0 16 C and I SO 23 0 2 5 C ISO 2 3 0 16 C and ISO 2 3 0 25 C PTS pow er tr ansfe r swit ch...

Page 12: ...performed manually Functional and connection errors faults will then be checked Press the test button for 2 seconds If you continue to press this button all the icons that are possible will be display...

Page 13: ...eq Smart Value service label This label will give you additional benefits and assurances with regard to service Read more about this on our website You can take the device back to your supplier or sen...

Page 14: ...NSTALLATION UND MONTAGE Wichtiger Hinweis Achten Sie darauf dass der Apparat w hrend Montage und Anschluss vollkommen spannungslos ist Die Installation darf nur von qualifizierten Technikern ausgef hr...

Page 15: ...twaigen weiteren Zusatzger ten wie z B eine Umschaltbox f r Inverter Netzspannung Die Verkabelungen gut fest gegen das Chassis oder die Verkleidung anbringen Das Eingangskabel des Isolierw chters kann...

Page 16: ...5C sind speziell f r Kombi Ger t Inverter und Akkulader in einem oder einen Inverter in Kombination mit einer Umschaltbox f r Netzspannung PTS 230 25 Siehe Diagramme auf der n chsten Seite ISO 2 3 0 1...

Page 17: ...17 DE ISO 2 3 0 16 C und IS O 23 0 2 5 C ISO 2 3 0 16 C und ISO 2 3 0 25 C PTS Ums ch altb ox...

Page 18: ...hrt Manueller Selbsttest Es ist auch m glich einen manuellen Test durchzuf hren Hierbei wird auf Funktions und Anschlussfehler gepr ft Dr cken Sie dazu die Taste Test 2 Sekunden lang Wenn diese Taste...

Page 19: ...ie gute Gr nde daf r haben die Einstellungen doch ndern zu wollen nehmen Sie bitte Kontakt mit uns auf Anzeigen im Display E01 PE Anschlussfehler kein niedriger Widerstand zwischen E und KE E02 System...

Page 20: ...r Reparatur Der Garantiezeitraum ist nur dann wirksam wenn bei der Reparatur der Kaufbeleg oder eine Kopie davon bergeben wurde Die Garantie erlischt bei Reparaturarbeiten durch Dritte sowie bei fehle...

Page 21: ...21 Xenteq BV...

Page 22: ...22 Banmolen 14 5768 ET Meijel NL Tel 0031 0 77 4662067 Fax 0031 0 77 4662845 info xenteq nl www xenteq nl www isolatiewachter nl V1 7...

Reviews: