background image

 

13

 

 

 

EN 

 

Remove  the  connected  device  if  this  is  causing  the  earthing 
leakage. 

 

Press the Reset button for 2 seconds. 

 

The  isometer  will  reset  itself  and  will  again  run  through  the 
self-test. 

 

Settings menu 

The  isometer's  settings  may  not  be  changed.  The  Menu  button 
has,  therefore,  been  protected  with  a  password.    If  you  have  a 
real  reason  why  you  would  want  to  change  the  settings,  please 
contact us. 

 

Information display 

E01= PE connection error, no low resistance between E and  KE. 
E02= system connection error, no low resistance between L1 and 
N. 
E03 to Exx = internal error report. 

 

 

= password activated 

 
 
 

W A R R A NT Y   A N D S ER VIC E  

 
                       The ISO series is supplied with the Xenteq "Smart     
                       Value"  service  label.  This  label  will  give  you 
additional  benefits  and  assurances  with regard to service.  Read 
more about this on our website. 
 
You can take the device back to your supplier or send it straight 
to  the  address  on  the  reverse  should  there  be  a  fault.  Please 
ensure you pay for the postage when sending the isometer. The 
ISO series has a 2 year guarantee as from the purchase date on 
the  parts  and  labour  costs  related  to  its  repair.  The  guarantee 
period is only applicable if the purchase form (copy) is submitted 
when  the  isometer  is  sent  in  for  repair.  The  guarantee  will  no 
longer apply with regard to repair work performed by third parties, 
when used incorrectly or with the connection of the inverter.  

The  customer  is  responsible  for  the  use  of  this  isometer.  The 

manufacturer cannot be held liable for any (consequential) losses.

Summary of Contents for ISO Series

Page 1: ...Nederlands ISO SERIES Ge bru i ksaanwijz in g P a g i n a 2 Users m an u al P a g e 8 G eb rau chs anw eisu ng Se i t e 1 4 NL EN DE...

Page 2: ...ron De modellen ISO 230 16C en ISO 230 25C zijn speciaal geschikt voor z g n combi s acculader en inverter in n of als er gewerkt wordt met een voorrangschakelaar omschakelbox tussen netspanning en in...

Page 3: ...iebewaker altijd direct aan op de inverter generator Dus voor eventuele overige randapparatuur zoals bijvoorbeeld een omschakelbox voor inverter netspanning Monteer de bekabelingen goed vast tegen cha...

Page 4: ...oor aansluiting met de vaste netspanning Sluit deze mains in aan op dezelfde netspanning ingang van de combi unit ofwel van de voorrang schakelaar zoals bijvoorbeeld de PTS 230 25 Zie schema op de vol...

Page 5: ...zijn gecontroleerd is kan de ingangspanning van het zwevend stelsel aangeschakeld worden De isolatiebewaker zal de zelftest doorlopen Hierna is het systeem klaar voor gebruik ISO 2 3 0 16 C en IS O 2...

Page 6: ...econstateerd worden dan gaan alle de led s knipperen en verschijnt er een foutcode in het display zie paragraaf weergaves display In geval van een foutmelding schakel de stroombron uit verhelp de fout...

Page 7: ...met het Smart Value service label van Xenteq Dit label geeft u extra voordelen en zekerheden op het gebied van service Lees meer hierover op onze website In geval van een defect kunt u het apparaat t...

Page 8: ...ransfer switch INSTALLATION Important Make sure the system is completely voltage free during the installation and connection The installation may only be carried out by qualified engineers Only one is...

Page 9: ...efore for any other peripherals such as for example a switch box for an inverter line voltage Mount the cabling correctly against the chassis or plating The input cable of the isometer can be connecte...

Page 10: ...l input for connection with the mains AC power Connect this mains in to the same AC input from the combi unit or to the mains input from the power transfer switch such as the PTS 230 25 See drawings n...

Page 11: ...11 EN ISO 2 3 0 16 C and I SO 23 0 2 5 C ISO 2 3 0 16 C and ISO 2 3 0 25 C PTS pow er tr ansfe r swit ch...

Page 12: ...performed manually Functional and connection errors faults will then be checked Press the test button for 2 seconds If you continue to press this button all the icons that are possible will be display...

Page 13: ...eq Smart Value service label This label will give you additional benefits and assurances with regard to service Read more about this on our website You can take the device back to your supplier or sen...

Page 14: ...NSTALLATION UND MONTAGE Wichtiger Hinweis Achten Sie darauf dass der Apparat w hrend Montage und Anschluss vollkommen spannungslos ist Die Installation darf nur von qualifizierten Technikern ausgef hr...

Page 15: ...twaigen weiteren Zusatzger ten wie z B eine Umschaltbox f r Inverter Netzspannung Die Verkabelungen gut fest gegen das Chassis oder die Verkleidung anbringen Das Eingangskabel des Isolierw chters kann...

Page 16: ...5C sind speziell f r Kombi Ger t Inverter und Akkulader in einem oder einen Inverter in Kombination mit einer Umschaltbox f r Netzspannung PTS 230 25 Siehe Diagramme auf der n chsten Seite ISO 2 3 0 1...

Page 17: ...17 DE ISO 2 3 0 16 C und IS O 23 0 2 5 C ISO 2 3 0 16 C und ISO 2 3 0 25 C PTS Ums ch altb ox...

Page 18: ...hrt Manueller Selbsttest Es ist auch m glich einen manuellen Test durchzuf hren Hierbei wird auf Funktions und Anschlussfehler gepr ft Dr cken Sie dazu die Taste Test 2 Sekunden lang Wenn diese Taste...

Page 19: ...ie gute Gr nde daf r haben die Einstellungen doch ndern zu wollen nehmen Sie bitte Kontakt mit uns auf Anzeigen im Display E01 PE Anschlussfehler kein niedriger Widerstand zwischen E und KE E02 System...

Page 20: ...r Reparatur Der Garantiezeitraum ist nur dann wirksam wenn bei der Reparatur der Kaufbeleg oder eine Kopie davon bergeben wurde Die Garantie erlischt bei Reparaturarbeiten durch Dritte sowie bei fehle...

Page 21: ...21 Xenteq BV...

Page 22: ...22 Banmolen 14 5768 ET Meijel NL Tel 0031 0 77 4662067 Fax 0031 0 77 4662845 info xenteq nl www xenteq nl www isolatiewachter nl V1 7...

Reviews: