Optional Equipment
976-0043-01-02
3–39
Figure 3-21
Utility Wiring to the Inverter Input
Optional Equipment
Stacking Dual Inverter Systems
To power 120/240 Vac loads you can link or stack two identical inverters
together in series by using the ISC-S cable. The ISC-S cable connects to
the stacking ports on the AC end of the
Sine Wave Plus
.
This cable is not provided with the inverter and must be purchased
separately. Install this cable prior to making the AC wiring connections.
For complete installation and wiring instructions for using the ISC-S
cable, please see the ISC-S Cable Owner’s Guide.
The ISC-S cable does not allow programming or access to the display
from one inverter to the other. If there are changes to the default setting
necessary, each inverter must be programmed separately.
Summary of Contents for SW Plus 2524
Page 2: ......
Page 3: ...Sine Wave Plus Inverter Charger Owner s Manual...
Page 82: ...2 48...
Page 105: ...DC Wiring 976 0043 01 02 3 23 Figure 3 13 DC Connections to a Single Inverter...
Page 107: ...DC Wiring 976 0043 01 02 3 25 Figure 3 14 DC Connections to Dual Inverters...
Page 126: ...3 44...
Page 132: ...4 6...
Page 141: ...Menu Map 976 0043 01 02 5 9 Figure 5 10 User Menu Map Part 2...
Page 143: ...Menu Map 976 0043 01 02 5 11 Figure 5 12 Basic Setup Menu Map Part 2...
Page 145: ...Menu Map 976 0043 01 02 5 13 Figure 5 14 Advanced Setup Menu Map Part 2...
Page 146: ...Navigation 5 14 976 0043 01 02 Figure 5 15 Complete User Menu Map...
Page 147: ...Menu Map 976 0043 01 02 5 15 Figure 5 16 Complete Basic Setup Menu Map...
Page 148: ...Navigation 5 16 976 0043 01 02 Figure 5 17 Complete Advanced Setup Menu Map...
Page 250: ...8 32...
Page 274: ...A 16...
Page 308: ...C 18...
Page 312: ...D 4...
Page 316: ...E 4...
Page 338: ...I 6...
Page 342: ...Index IX 4 976 0043 01 02...
Page 343: ......