Battery Charging Reference for the Main Charger
B–6
975-0125-02-01
AC Reconnect Summary
If AC is disconnected during charging, the charge stage after AC is reconnected is
indicated in Table B-2.
Table B-2
AC Reconnect Summary
∆
T
F
Float Timeout (days)
21
21
21
∆
T
E
Equalize Timeout (hours)
1
NA
NA
Important: The custom battery factory defaults are the same as for an AGM
battery.
Time
Flooded (or wet) Gel
AGM
Charge Stage
Before AC Reconnect
After AC Reconnect
Bulk
Bulk
Absorption
Float/No Float
Float/No Float
Float/No Float
Equalize
Float/No Float
Summary of Contents for MS2000
Page 1: ...MS2000 Sine Wave Inverter Charger Operation Guide MS2000 ...
Page 2: ......
Page 3: ...MS2000 Sine Wave Inverter Charger Operation Guide ...
Page 8: ...vi ...
Page 18: ...xvi ...
Page 28: ...Introduction 1 10 975 0125 02 01 Figure 1 5 DC Grounding Completed ...
Page 124: ...IX 4 ...
Page 125: ......