Flat rooF application
Framed and frameless PV - Modules
Assembly sequence of the flat roof support with Frameless
PV Modules:
The assembly sequence for the base rails and preassembled triangles are
the same as described in sections 1.1 to 6.3.
See Figure 9.1
(Torque: 6 to 8 ft. lbs.)
Now, position the thin-film end clamp and thin-film mid clamp into the
module rack slot with the T-Bolts. Clamps should be attached ¼ of the way
down from the edge of the module.
See Figure 9.2
Then, slide the module into the thin-film end clamp and tighten the T-Bolts
clockwise. (Torque: 6 to 8 ft. lbs.)
Next, slide the thin-film mid clamp onto the module and tighten the T-Bolts by
turning hex nuts clockwise.
See Figure 9.3
(Torque: 6 to 8 ft. lbs.)
Check for correct alignment of the
hammer-head bolts in the mounting rail
slot. The line on back of T-Blot needs to
be perpendicular to the mounting rail.
See Figure 9.4
Key Components:
• C-Si End Clamp
• C-Si Mid Clamp
• Thin film End Clamp
• C-Si Mid Clamp
• Cross Adapter
• Diagonal Strap
• 10°- 15° Triangle
• 20°- 30° Triangle
• 35°- 45° Triangle
• Angle Bracket
• Non Slip Safety Hardware
• ST-AK 120/90 Mounting Rail
• ST-AK 120/90 Splice
• ST-AK 60/37 Mounting Rail
• ST-AK 60/37 Splice
Subject
to
technical
changes
Copyright
©
2009
HatiCon
Solar,
LLC
Page
9
of
11
Assembly
sequence
of
the
flat
roof
support
with
Frameless
PV
Modules:
The
assembly
sequence
for
the
base
rails
and
pre
‐
assembled
triangles
are
the
same
as
described
in
sections
1.1
to
6.3.
See
Figure
9.1
(Torque:
6
to
8
ft.
lbs.)
Now,
position
the
thin
‐
film
end
clamp
and
thin
‐
film
mid
clamp
into
the
module
rack
slot
with
the
T
‐
Bolts.
Clamps
should
be
attached
¼
of
the
way
down
from
the
edge
of
the
module.
See
Figure
9.2
Then,
slide
the
module
into
the
thin
‐
film
end
clamp
and
tighten
the
T
‐
Bolts
clockwise.
(Torque:
6
to
8
ft.
lbs.)
Next,
slide
the
thin
‐
film
mid
clamp
onto
the
module
and
tighten
the
T
‐
Bolts
by
turning
hex
nuts
clockwise.
See
Figure
9.3
(Torque:
6
to
8
ft.
lbs.)
Check
for
correct
alignment
of
the
hammer
‐
head
bolts
in
the
mounting
rail
slot.
The
line
on
back
of
T
‐
Blot
needs
to
be
perpendicular
to
the
mounting
rail.
See
Figure
9.4
9.1
9.2
9.3
9.4
Subject
to
technical
changes
Copyright
©
2009
HatiCon
Solar,
LLC
Page
9
of
11
Assembly
sequence
of
the
flat
roof
support
with
Frameless
PV
Modules:
The
assembly
sequence
for
the
base
rails
and
pre
‐
assembled
triangles
are
the
same
as
described
in
sections
1.1
to
6.3.
See
Figure
9.1
(Torque:
6
to
8
ft.
lbs.)
Now,
position
the
thin
‐
film
end
clamp
and
thin
‐
film
mid
clamp
into
the
module
rack
slot
with
the
T
‐
Bolts.
Clamps
should
be
attached
¼
of
the
way
down
from
the
edge
of
the
module.
See
Figure
9.2
Then,
slide
the
module
into
the
thin
‐
film
end
clamp
and
tighten
the
T
‐
Bolts
clockwise.
(Torque:
6
to
8
ft.
lbs.)
Next,
slide
the
thin
‐
film
mid
clamp
onto
the
module
and
tighten
the
T
‐
Bolts
by
turning
hex
nuts
clockwise.
See
Figure
9.3
(Torque:
6
to
8
ft.
lbs.)
Check
for
correct
alignment
of
the
hammer
‐
head
bolts
in
the
mounting
rail
slot.
The
line
on
back
of
T
‐
Blot
needs
to
be
perpendicular
to
the
mounting
rail.
See
Figure
9.4
9.1
9.2
9.3
9.4
Subject
to
technical
changes
Copyright
©
2009
HatiCon
Solar,
LLC
Page
9
of
11
Assembly
sequence
of
the
flat
roof
support
with
Frameless
PV
Modules:
The
assembly
sequence
for
the
base
rails
and
pre
‐
assembled
triangles
are
the
same
as
described
in
sections
1.1
to
6.3.
See
Figure
9.1
(Torque:
6
to
8
ft.
lbs.)
Now,
position
the
thin
‐
film
end
clamp
and
thin
‐
film
mid
clamp
into
the
module
rack
slot
with
the
T
‐
Bolts.
Clamps
should
be
attached
¼
of
the
way
down
from
the
edge
of
the
module.
See
Figure
9.2
Then,
slide
the
module
into
the
thin
‐
film
end
clamp
and
tighten
the
T
‐
Bolts
clockwise.
(Torque:
6
to
8
ft.
lbs.)
Next,
slide
the
thin
‐
film
mid
clamp
onto
the
module
and
tighten
the
T
‐
Bolts
by
turning
hex
nuts
clockwise.
See
Figure
9.3
(Torque:
6
to
8
ft.
lbs.)
Check
for
correct
alignment
of
the
hammer
‐
head
bolts
in
the
mounting
rail
slot.
The
line
on
back
of
T
‐
Blot
needs
to
be
perpendicular
to
the
mounting
rail.
See
Figure
9.4
9.1
9.2
9.3
9.4
Subject
to
technical
changes
Copyright
©
2009
HatiCon
Solar,
LLC
Page
9
of
11
Assembly
sequence
of
the
flat
roof
support
with
Frameless
PV
Modules:
The
assembly
sequence
for
the
base
rails
and
pre
‐
assembled
triangles
are
the
same
as
described
in
sections
1.1
to
6.3.
See
Figure
9.1
(Torque:
6
to
8
ft.
lbs.)
Now,
position
the
thin
‐
film
end
clamp
and
thin
‐
film
mid
clamp
into
the
module
rack
slot
with
the
T
‐
Bolts.
Clamps
should
be
attached
¼
of
the
way
down
from
the
edge
of
the
module.
See
Figure
9.2
Then,
slide
the
module
into
the
thin
‐
film
end
clamp
and
tighten
the
T
‐
Bolts
clockwise.
(Torque:
6
to
8
ft.
lbs.)
Next,
slide
the
thin
‐
film
mid
clamp
onto
the
module
and
tighten
the
T
‐
Bolts
by
turning
hex
nuts
clockwise.
See
Figure
9.3
(Torque:
6
to
8
ft.
lbs.)
Check
for
correct
alignment
of
the
hammer
‐
head
bolts
in
the
mounting
rail
slot.
The
line
on
back
of
T
‐
Blot
needs
to
be
perpendicular
to
the
mounting
rail.
See
Figure
9.4
9.1
9.2
9.3
9.4
Fig. 9.1
Fig. 9.2
Fig. 9.3
Fig. 9.4
The designs are based on the following codes:
• 2006 International Building Code
• American Society of Civil Engineers 7-05
• 2005 Aluminum Design Manual
• American Institute of Steel Construction Manual Thirteen Edition
• American Concrete Institute ACI 318R-05
Assembly Instructions
7
Solar
Mounting Sytem