Flat rooF application 

Framed and frameless PV - Modules

Assembly sequence of the flat roof support with Frameless  
PV Modules:

The assembly sequence for the base rails and preassembled triangles are 
the same as described in sections 1.1 to 6.3. 

See Figure 9.1

(Torque: 6 to 8 ft. lbs.)

Now, position the thin-film end clamp and thin-film mid clamp into the 
module rack slot with the T-Bolts. Clamps should be attached ¼ of the way 
down from the edge of the module. 

See Figure 9.2

Then, slide the module into the thin-film end clamp and tighten the T-Bolts 
clockwise. (Torque: 6 to 8 ft. lbs.)

Next, slide the thin-film mid clamp onto the module and tighten the T-Bolts by 
turning hex nuts clockwise. 

See Figure 9.3 

(Torque: 6 to 8 ft. lbs.)

Check for correct alignment of the 
hammer-head bolts in the mounting rail 
slot. The line on back of T-Blot needs to 
be perpendicular to the mounting rail. 

See Figure 9.4

Key Components:

•  C-Si End Clamp
•  C-Si Mid Clamp
•  Thin film End Clamp
•  C-Si Mid Clamp
•  Cross Adapter
•  Diagonal Strap
•  10°- 15° Triangle
•  20°- 30° Triangle
•  35°- 45° Triangle
•  Angle Bracket
•  Non Slip Safety Hardware
•  ST-AK 120/90 Mounting Rail
•  ST-AK 120/90 Splice
•  ST-AK 60/37 Mounting Rail
•  ST-AK 60/37 Splice

 

 

Subject

 

to

 

technical

 

changes

   

 

Copyright

 

©

 

2009

 

HatiCon

 

Solar,

 

LLC

   

 

Page

 

9

 

of

 

11

 

 

 

Assembly

 

sequence

 

of

 

the

 

flat

 

roof

 

support

 

with

 

Frameless

 

PV

 

Modules:

 

  

 

The

 

assembly

 

sequence

 

for

 

the

 

base

 

rails

 

and

 

pre

assembled

 

triangles

 

are

 

the

 

same

 

as

 

described

 

in

 

sections

 

1.1

 

to

 

6.3.

  

See

 

Figure

 

9.1

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

 

 

 

 

 

  

Now,

 

position

 

the

 

thin

film

 

end

 

clamp

 

and

 

thin

film

 

mid

 

clamp

 

into

 

the

 

module

 

rack

 

slot

 

with

 

the

 

T

Bolts.

 

Clamps

 

should

 

be

 

attached

 

¼

 

of

 

the

 

way

 

down

 

from

 

the

 

edge

 

of

 

the

 

module.

  

See

 

Figure

 

9.2

 

 

 

Then,

 

slide

 

the

 

module

 

into

 

the

 

thin

film

 

end

 

clamp

 

and

 

tighten

 

the

 

T

Bolts

 

clockwise.

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

  

 

 

 

 

 

Next,

 

slide

 

the

 

thin

film

 

mid

 

clamp

 

onto

 

the

 

module

 

and

 

tighten

 

the

 

T

Bolts

 

by

 

turning

 

hex

 

nuts

 

clockwise.

  

See

 

Figure

 

9.3

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

 

 

 

 

 

 

Check

 

for

 

correct

 

alignment

 

of

 

the

 

hammer

head

 

bolts

 

in

 

the

 

mounting

 

rail

 

slot.

 

The

 

line

 

on

 

back

 

of

 

T

Blot

 

needs

 

to

 

be

 

perpendicular

 

to

 

the

 

mounting

 

rail.

  

See

 

Figure

 

9.4

 

 

 

 

9.1

 

9.2

 

9.3

 

9.4

 

 

 

Subject

 

to

 

technical

 

changes

   

 

Copyright

 

©

 

2009

 

HatiCon

 

Solar,

 

LLC

   

 

Page

 

9

 

of

 

11

 

 

 

Assembly

 

sequence

 

of

 

the

 

flat

 

roof

 

support

 

with

 

Frameless

 

PV

 

Modules:

 

  

 

The

 

assembly

 

sequence

 

for

 

the

 

base

 

rails

 

and

 

pre

assembled

 

triangles

 

are

 

the

 

same

 

as

 

described

 

in

 

sections

 

1.1

 

to

 

6.3.

  

See

 

Figure

 

9.1

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

 

 

 

 

 

  

Now,

 

position

 

the

 

thin

film

 

end

 

clamp

 

and

 

thin

film

 

mid

 

clamp

 

into

 

the

 

module

 

rack

 

slot

 

with

 

the

 

T

Bolts.

 

Clamps

 

should

 

be

 

attached

 

¼

 

of

 

the

 

way

 

down

 

from

 

the

 

edge

 

of

 

the

 

module.

  

See

 

Figure

 

9.2

 

 

 

Then,

 

slide

 

the

 

module

 

into

 

the

 

thin

film

 

end

 

clamp

 

and

 

tighten

 

the

 

T

Bolts

 

clockwise.

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

  

 

 

 

 

 

Next,

 

slide

 

the

 

thin

film

 

mid

 

clamp

 

onto

 

the

 

module

 

and

 

tighten

 

the

 

T

Bolts

 

by

 

turning

 

hex

 

nuts

 

clockwise.

  

See

 

Figure

 

9.3

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

 

 

 

 

 

 

Check

 

for

 

correct

 

alignment

 

of

 

the

 

hammer

head

 

bolts

 

in

 

the

 

mounting

 

rail

 

slot.

 

The

 

line

 

on

 

back

 

of

 

T

Blot

 

needs

 

to

 

be

 

perpendicular

 

to

 

the

 

mounting

 

rail.

  

See

 

Figure

 

9.4

 

 

 

 

9.1

 

9.2

 

9.3

 

9.4

 

 

 

Subject

 

to

 

technical

 

changes

   

 

Copyright

 

©

 

2009

 

HatiCon

 

Solar,

 

LLC

   

 

Page

 

9

 

of

 

11

 

 

 

Assembly

 

sequence

 

of

 

the

 

flat

 

roof

 

support

 

with

 

Frameless

 

PV

 

Modules:

 

  

 

The

 

assembly

 

sequence

 

for

 

the

 

base

 

rails

 

and

 

pre

assembled

 

triangles

 

are

 

the

 

same

 

as

 

described

 

in

 

sections

 

1.1

 

to

 

6.3.

  

See

 

Figure

 

9.1

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

 

 

 

 

 

  

Now,

 

position

 

the

 

thin

film

 

end

 

clamp

 

and

 

thin

film

 

mid

 

clamp

 

into

 

the

 

module

 

rack

 

slot

 

with

 

the

 

T

Bolts.

 

Clamps

 

should

 

be

 

attached

 

¼

 

of

 

the

 

way

 

down

 

from

 

the

 

edge

 

of

 

the

 

module.

  

See

 

Figure

 

9.2

 

 

 

Then,

 

slide

 

the

 

module

 

into

 

the

 

thin

film

 

end

 

clamp

 

and

 

tighten

 

the

 

T

Bolts

 

clockwise.

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

  

 

 

 

 

 

Next,

 

slide

 

the

 

thin

film

 

mid

 

clamp

 

onto

 

the

 

module

 

and

 

tighten

 

the

 

T

Bolts

 

by

 

turning

 

hex

 

nuts

 

clockwise.

  

See

 

Figure

 

9.3

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

 

 

 

 

 

 

Check

 

for

 

correct

 

alignment

 

of

 

the

 

hammer

head

 

bolts

 

in

 

the

 

mounting

 

rail

 

slot.

 

The

 

line

 

on

 

back

 

of

 

T

Blot

 

needs

 

to

 

be

 

perpendicular

 

to

 

the

 

mounting

 

rail.

  

See

 

Figure

 

9.4

 

 

 

 

9.1

 

9.2

 

9.3

 

9.4

 

 

 

Subject

 

to

 

technical

 

changes

   

 

Copyright

 

©

 

2009

 

HatiCon

 

Solar,

 

LLC

   

 

Page

 

9

 

of

 

11

 

 

 

Assembly

 

sequence

 

of

 

the

 

flat

 

roof

 

support

 

with

 

Frameless

 

PV

 

Modules:

 

  

 

The

 

assembly

 

sequence

 

for

 

the

 

base

 

rails

 

and

 

pre

assembled

 

triangles

 

are

 

the

 

same

 

as

 

described

 

in

 

sections

 

1.1

 

to

 

6.3.

  

See

 

Figure

 

9.1

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

 

 

 

 

 

  

Now,

 

position

 

the

 

thin

film

 

end

 

clamp

 

and

 

thin

film

 

mid

 

clamp

 

into

 

the

 

module

 

rack

 

slot

 

with

 

the

 

T

Bolts.

 

Clamps

 

should

 

be

 

attached

 

¼

 

of

 

the

 

way

 

down

 

from

 

the

 

edge

 

of

 

the

 

module.

  

See

 

Figure

 

9.2

 

 

 

Then,

 

slide

 

the

 

module

 

into

 

the

 

thin

film

 

end

 

clamp

 

and

 

tighten

 

the

 

T

Bolts

 

clockwise.

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

  

 

 

 

 

 

Next,

 

slide

 

the

 

thin

film

 

mid

 

clamp

 

onto

 

the

 

module

 

and

 

tighten

 

the

 

T

Bolts

 

by

 

turning

 

hex

 

nuts

 

clockwise.

  

See

 

Figure

 

9.3

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

 

 

 

 

 

 

Check

 

for

 

correct

 

alignment

 

of

 

the

 

hammer

head

 

bolts

 

in

 

the

 

mounting

 

rail

 

slot.

 

The

 

line

 

on

 

back

 

of

 

T

Blot

 

needs

 

to

 

be

 

perpendicular

 

to

 

the

 

mounting

 

rail.

  

See

 

Figure

 

9.4

 

 

 

 

9.1

 

9.2

 

9.3

 

9.4

 

Fig. 9.1

Fig. 9.2

Fig. 9.3

Fig. 9.4

The designs are based on the following codes:

•  2006 International Building Code
•  American Society of Civil Engineers 7-05
•  2005 Aluminum Design Manual
•  American Institute of Steel Construction Manual Thirteen Edition
•  American Concrete Institute ACI 318R-05

Assembly Instructions 

7

Solar 

Mounting Sytem

Summary of Contents for Framed PV

Page 1: ...Solar Mounting System Assembly Instructions...

Page 2: ......

Page 3: ...n sliding the rear post vertically until the next adjustment hole is visible through the hole in which the bolt was removed Fasten all triangles at desired tilt angle Framed Modules portrait Framed Mo...

Page 4: ...bject to technical changes Copyright 2009 HatiCon Solar LLC Page Assembly sequence of the flat roof First the angle brackets must be assembled b fastening T Bolt nut and washer Hardware m remain loose...

Page 5: ...of 11 Installing Triangles Triangles can now be mounted to base rails To do this properly space triangles on the base rail per the structural site specific drawings and attach with cross adapters A to...

Page 6: ...6 1 One of these is mounted for each completed row and at least one for every 40 ft The diagonal straps are fastened to the rear triangle struts using T Bolts See Figure 6 2 Torque 6 to 8 ft lbs Insta...

Page 7: ...s Clamps should be attached of the way down from the edge of the module See Figure 9 2 Then slide the module into the thin film end clamp and tighten the T Bolts clockwise Torque 6 to 8 ft lbs Next sl...

Page 8: ...g instructions reflect the state of technology and our experience on how to install our systems on site Due to the fact that each roof has individual characteristics we highly recommend commissioning...

Page 9: ...can be attached using a splice To install simply insert the splice into the end of the rail that will need to be joined until the rivet on the middle of the splice stops the insertion Then slide the o...

Page 10: ...click the mid clamp onto the mounting rail an slide it onto the module Ensure that the mid clam clicks onto both sides of the mounting rail See Figure 4 2 Now slide the next module under the mid clam...

Page 11: ...the horizontal substrate rails for each row of modules using the cross adapters Click the cross adapters onto the base rails and slide attachment lip into channel on base rail Fasten the clamp screws...

Page 12: ...uring installation If a concrete foundation is prepared the sinking of the sigma posts with rebar requires a reinforced foundation A hole must be drilled within 8 inches of the bottom of the sigma pos...

Page 13: ...nges Copyright 2009 HatiCon Solar LLC Page 3 of 8 The previously assembled bearing block and vertical post assembly from step 3 are inserted into the sigma posts with the short vertical posts serving...

Page 14: ...ardware ST AK 120 90 Mounting Rail ST AK 120 90 Splice ST AK 60 37 Mounting Rail ST AK 60 37 Splice ST AK 66 37 Mounting Rail ST AK 66 37 Splice The designs are based on the following codes 2006 Inter...

Page 15: ...side of bearing block must face thin side of vertical post profile to maintain structural Integrity See Figures 3 1 and 3 2 Nut and washer must be fastened on the thick side of the vertical post extru...

Page 16: ...est axis See Figure 5 1 5 2 The T Bolts must be turned 45 clockwise until they cannot be turned any further See Figure 5 2 A line on the bottom of the T bolts shows proper alignment Line must be perpe...

Page 17: ...ils and slide attachment lip into channel of base rail on either side See Figures 7 1 7 2 Fasten the clamp screws by turning clockwise Torque to 6 to 8 ft Lbs ST AK 60 37 7 1 7 2 Fig 8 1 Fig 8 2 Subje...

Page 18: ...f a column of landscape oriented modules See Figure 10 3 Once the module is mounted click the mid clamp onto the module rail and slide the clamp onto the module frame See Figure 10 4 10 4 10 3 Adjusta...

Page 19: ......

Page 20: ...W rth Canada Limited Limit e 6330 Tomken Road Mississauga Ontario Canada L5T 1N2 Tel 905 564 6225 Fax 905 564 3671 www wurthcanada com...

Reviews: