Assembling

 

System

 

Using

 

Cross

 

Rails:

 

 

Follow

 

the

 

assembly

 

sequence

 

for

 

the

 

horizontal,

 

substructure

 

rail

 

described

 

in

 

sections

 

1

 

to

 

3.2.

 

 

 

 

 

 

 

 

 

 

 

Mount

 

the

 

vertical

 

mounting

 

rails

 

onto

 

the

 

horizontal

 

substrate

 

rails

 

for

 

each

 

row

 

of

 

modules

 

using

 

the

 

cross

 

adapters.

 

 

Click

 

the

 

cross

 

adapters

 

onto

 

the

 

base

 

rails

 

and

 

slide

 

attachment

 

lip

 

into

 

channel

 

on

 

base

 

rail.

 

Fasten

 

the

 

clamp

 

screws

 

by

 

turning

 

clockwise.

 

See

 

Figures

 

5.2

 

&

 

5.3

 

 

(Torque:

 

6

 

to

 

8

 

ft.

 

Lbs)

 

 

 

 

 

 

 

 

 

 

Use

 

the

 

correct

 

number

 

of

 

cross

 

adapters

 

for

 

the

 

mounting

 

rails.

 

Number

 

of

 

clamps

 

per

 

intersection

 

point:

 

 

 

ST/AK

 

7/47

 

=

 

1

 

cross

 

adapter

 

 

ST/AK

 

13/60

 

=

 

2

 

cross

 

adapters

 

 

To

 

set

 

up

 

several

 

mounting

 

rails

 

in

 

a

 

row,

 

follow

 

the

 

procedure

 

described

 

under

 

section

 

1

3.

  

 

 

 

5.1

 

5.2

 

Click

 

5.3

 

Assembling System Using Cross Rails:

Follow the assembly sequence for the 
horizontal, substructure rail described in 
sections 1 to 3.2.

Mount the vertical mounting rails onto the 
horizontal substrate rails for each row of 
modules using the cross adapters.

Click the cross adapters onto the base 
rails and slide attachment lip into channel 
on base rail. Fasten the clamp screws by 
turning clockwise.  

See Figures 5.2 & 

5.3

 (Torque: 6 to 8 ft. Lbs)

Use the correct number of cross adapters for the mounting rails. Number of 
clamps per intersection point:

•  ST/AK 60/37 = 2 cross adapter
•  ST/AK 66/37 = 2 cross adapters
•  ST/AK 66/37 = 2 cross adapters
•  ST/AK 120/90 = 4 cross adapters

To set up several mounting rails in a 
row, follow the procedure described 
under section 1-3.

Slide the end clamp onto the vertical mounting rails as shown in section 4.1.
Afterwards, slide a locking clip onto the end of each vertical mounting rail 
and fasten it by tightening the screw clockwise.

 See Figure 5.4 

 

(Torque: 6 to 8 ft. lbs.)

Slide the first module into 
the end clamp. Then, 
adjust the end clamp to 
the module frame height 
as illustrated in section 
4.1. Additional modules 
are mounted as described 
in sections 4.2 to 4.5.

Key Components:

•  C-Si End Clamp 
•  C-Si Mid Clamp 
•  Thin Film End Clamp 
•  Thin Film Mid Clamp
•  Cross Adapter 
•  Angle Bracket
•  ST-AK 66/37 Mounting Rail
•  ST-AK 60/37 Mounting Rail

•  Locking Clip 
•  Anti-Slip Hardware 
•  ST-AK 66/37 Splice
•  ST-AK 60/37 Splice

pitched rooF application 

For framed PV-Modules

Fig. 5.1

Fig. 5.2

Fig. 5.3

 

Subject

 

to

 

technical

 

changes

   

 

Copyright

 

©

 

2009

 

HatiCon

 

Solar,

 

LLC

   

 

Page

 

7

 

of

 

10

 

 

Assembling

 

System

 

Using

 

Cross

 

Rails:

 

 

Follow

 

the

 

assembly

 

sequence

 

for

 

the

 

horizontal,

 

substructure

 

rail

 

described

 

in

 

sections

 

1

 

to

 

3.2.

 

 

 

 

 

 

 

 

 

 

 

Mount

 

the

 

vertical

 

mounting

 

rails

 

onto

 

the

 

horizontal

 

substrate

 

rails

 

for

 

each

 

row

 

of

 

modules

 

using

 

the

 

cross

 

adapters.

 

 

Click

 

the

 

cross

 

adapters

 

onto

 

the

 

base

 

rails

 

and

 

slide

 

attachment

 

lip

 

into

 

channel

 

on

 

base

 

rail.

 

Fasten

 

the

 

clamp

 

screws

 

by

 

turning

 

clockwise.

 

See

 

Figures

 

5.2

 

&

 

5.3

 

 

(Torque:

 

6

 

to

 

8

 

ft.

 

Lbs)

 

 

 

 

 

 

 

 

 

 

Use

 

the

 

correct

 

number

 

of

 

cross

 

adapters

 

for

 

the

 

mounting

 

rails.

 

Number

 

of

 

clamps

 

per

 

intersection

 

point:

 

 

 

ST/AK

 

7/47

 

=

 

1

 

cross

 

adapter

 

 

ST/AK

 

13/60

 

=

 

2

 

cross

 

adapters

 

 

To

 

set

 

up

 

several

 

mounting

 

rails

 

in

 

a

 

row,

 

follow

 

the

 

procedure

 

described

 

under

 

section

 

1

3.

  

 

 

 

5.1

 

5.2

 

Click

 

5.3

 

 

Subject

 

to

 

technical

 

changes

   

 

Copyright

 

©

 

2009

 

HatiCon

 

Solar,

 

LLC

   

 

Page

 

7

 

of

 

10

 

 

Assembling

 

System

 

Using

 

Cross

 

Rails:

 

 

Follow

 

the

 

assembly

 

sequence

 

for

 

the

 

horizontal,

 

substructure

 

rail

 

described

 

in

 

sections

 

1

 

to

 

3.2.

 

 

 

 

 

 

 

 

 

 

 

Mount

 

the

 

vertical

 

mounting

 

rails

 

onto

 

the

 

horizontal

 

substrate

 

rails

 

for

 

each

 

row

 

of

 

modules

 

using

 

the

 

cross

 

adapters.

 

 

Click

 

the

 

cross

 

adapters

 

onto

 

the

 

base

 

rails

 

and

 

slide

 

attachment

 

lip

 

into

 

channel

 

on

 

base

 

rail.

 

Fasten

 

the

 

clamp

 

screws

 

by

 

turning

 

clockwise.

 

See

 

Figures

 

5.2

 

&

 

5.3

 

 

(Torque:

 

6

 

to

 

8

 

ft.

 

Lbs)

 

 

 

 

 

 

 

 

 

 

Use

 

the

 

correct

 

number

 

of

 

cross

 

adapters

 

for

 

the

 

mounting

 

rails.

 

Number

 

of

 

clamps

 

per

 

intersection

 

point:

 

 

 

ST/AK

 

7/47

 

=

 

1

 

cross

 

adapter

 

 

ST/AK

 

13/60

 

=

 

2

 

cross

 

adapters

 

 

To

 

set

 

up

 

several

 

mounting

 

rails

 

in

 

a

 

row,

 

follow

 

the

 

procedure

 

described

 

under

 

section

 

1

3.

  

 

 

 

5.1

 

5.2

 

Click

 

5.3

 

 

Subject

 

to

 

technical

 

changes

   

 

Copyright

 

©

 

2009

 

HatiCon

 

Solar,

 

LLC

   

 

Page

 

7

 

of

 

10

 

 

Assembling

 

System

 

Using

 

Cross

 

Rails:

 

 

Follow

 

the

 

assembly

 

sequence

 

for

 

the

 

horizontal,

 

substructure

 

rail

 

described

 

in

 

sections

 

1

 

to

 

3.2.

 

 

 

 

 

 

 

 

 

 

 

Mount

 

the

 

vertical

 

mounting

 

rails

 

onto

 

the

 

horizontal

 

substrate

 

rails

 

for

 

each

 

row

 

of

 

modules

 

using

 

the

 

cross

 

adapters.

 

 

Click

 

the

 

cross

 

adapters

 

onto

 

the

 

base

 

rails

 

and

 

slide

 

attachment

 

lip

 

into

 

channel

 

on

 

base

 

rail.

 

Fasten

 

the

 

clamp

 

screws

 

by

 

turning

 

clockwise.

 

See

 

Figures

 

5.2

 

&

 

5.3

 

 

(Torque:

 

6

 

to

 

8

 

ft.

 

Lbs)

 

 

 

 

 

 

 

 

 

 

Use

 

the

 

correct

 

number

 

of

 

cross

 

adapters

 

for

 

the

 

mounting

 

rails.

 

Number

 

of

 

clamps

 

per

 

intersection

 

point:

 

 

 

ST/AK

 

7/47

 

=

 

1

 

cross

 

adapter

 

 

ST/AK

 

13/60

 

=

 

2

 

cross

 

adapters

 

 

To

 

set

 

up

 

several

 

mounting

 

rails

 

in

 

a

 

row,

 

follow

 

the

 

procedure

 

described

 

under

 

section

 

1

3.

  

 

 

 

5.1

 

5.2

 

Click

 

5.3

 

 

Subject

 

to

 

technical

 

changes

   

 

Copyright

 

©

 

2009

 

HatiCon

 

Solar,

 

LLC

   

 

Page

 

8

 

of

 

10

 

 

 

Slide

 

the

 

end

 

clamp

 

onto

 

the

 

vertical

 

mounting

 

rails

 

as

 

shown

 

in

 

section

 

4.1.

   

Afterwards,

 

slide

 

a

 

locking

 

clip

 

onto

 

the

 

end

 

of

 

each

 

vertical

 

mounting

 

rail

 

and

 

fasten

 

it

 

by

 

tightening

 

the

 

screw

 

clockwise.

 

See

 

Figure

 

5.4

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

 

 

 

 

 

 

Slide

 

the

 

first

 

module

 

into

 

the

 

end

 

clamp.

 

Then,

 

adjust

 

the

 

end

 

clamp

 

to

 

the

 

module

 

frame

 

height

 

as

 

illustrated

 

in

 

section

 

4.1.

 

 

Additional

 

modules

 

are

 

mounted

 

as

 

described

 

in

 

sections

 

4.2

 

to

 

4.5.

 

 

 

5.5

 

5.4

 

 

Subject

 

to

 

technical

 

changes

   

 

Copyright

 

©

 

2009

 

HatiCon

 

Solar,

 

LLC

   

 

Page

 

8

 

of

 

10

 

 

 

Slide

 

the

 

end

 

clamp

 

onto

 

the

 

vertical

 

mounting

 

rails

 

as

 

shown

 

in

 

section

 

4.1.

   

Afterwards,

 

slide

 

a

 

locking

 

clip

 

onto

 

the

 

end

 

of

 

each

 

vertical

 

mounting

 

rail

 

and

 

fasten

 

it

 

by

 

tightening

 

the

 

screw

 

clockwise.

 

See

 

Figure

 

5.4

 

(Torque:

 

6

 

to

 

8

 

ft.

 

lbs.)

 

 

 

 

 

 

Slide

 

the

 

first

 

module

 

into

 

the

 

end

 

clamp.

 

Then,

 

adjust

 

the

 

end

 

clamp

 

to

 

the

 

module

 

frame

 

height

 

as

 

illustrated

 

in

 

section

 

4.1.

 

 

Additional

 

modules

 

are

 

mounted

 

as

 

described

 

in

 

sections

 

4.2

 

to

 

4.5.

 

 

 

5.5

 

5.4

 

Fig. 5.4

Fig. 5.5

The designs are based on the following codes:

•  2006 International Building Code
•  American Society of Civil Engineers 7-05
•  2005 Aluminum Design Manual
•  American Institute of Steel Construction Manual Thirteen Edition
•  American Concrete Institute ACI 318R-05

Assembly Instructions 

11

Solar 

Mounting Sytem

Summary of Contents for Framed PV

Page 1: ...Solar Mounting System Assembly Instructions...

Page 2: ......

Page 3: ...n sliding the rear post vertically until the next adjustment hole is visible through the hole in which the bolt was removed Fasten all triangles at desired tilt angle Framed Modules portrait Framed Mo...

Page 4: ...bject to technical changes Copyright 2009 HatiCon Solar LLC Page Assembly sequence of the flat roof First the angle brackets must be assembled b fastening T Bolt nut and washer Hardware m remain loose...

Page 5: ...of 11 Installing Triangles Triangles can now be mounted to base rails To do this properly space triangles on the base rail per the structural site specific drawings and attach with cross adapters A to...

Page 6: ...6 1 One of these is mounted for each completed row and at least one for every 40 ft The diagonal straps are fastened to the rear triangle struts using T Bolts See Figure 6 2 Torque 6 to 8 ft lbs Insta...

Page 7: ...s Clamps should be attached of the way down from the edge of the module See Figure 9 2 Then slide the module into the thin film end clamp and tighten the T Bolts clockwise Torque 6 to 8 ft lbs Next sl...

Page 8: ...g instructions reflect the state of technology and our experience on how to install our systems on site Due to the fact that each roof has individual characteristics we highly recommend commissioning...

Page 9: ...can be attached using a splice To install simply insert the splice into the end of the rail that will need to be joined until the rivet on the middle of the splice stops the insertion Then slide the o...

Page 10: ...click the mid clamp onto the mounting rail an slide it onto the module Ensure that the mid clam clicks onto both sides of the mounting rail See Figure 4 2 Now slide the next module under the mid clam...

Page 11: ...the horizontal substrate rails for each row of modules using the cross adapters Click the cross adapters onto the base rails and slide attachment lip into channel on base rail Fasten the clamp screws...

Page 12: ...uring installation If a concrete foundation is prepared the sinking of the sigma posts with rebar requires a reinforced foundation A hole must be drilled within 8 inches of the bottom of the sigma pos...

Page 13: ...nges Copyright 2009 HatiCon Solar LLC Page 3 of 8 The previously assembled bearing block and vertical post assembly from step 3 are inserted into the sigma posts with the short vertical posts serving...

Page 14: ...ardware ST AK 120 90 Mounting Rail ST AK 120 90 Splice ST AK 60 37 Mounting Rail ST AK 60 37 Splice ST AK 66 37 Mounting Rail ST AK 66 37 Splice The designs are based on the following codes 2006 Inter...

Page 15: ...side of bearing block must face thin side of vertical post profile to maintain structural Integrity See Figures 3 1 and 3 2 Nut and washer must be fastened on the thick side of the vertical post extru...

Page 16: ...est axis See Figure 5 1 5 2 The T Bolts must be turned 45 clockwise until they cannot be turned any further See Figure 5 2 A line on the bottom of the T bolts shows proper alignment Line must be perpe...

Page 17: ...ils and slide attachment lip into channel of base rail on either side See Figures 7 1 7 2 Fasten the clamp screws by turning clockwise Torque to 6 to 8 ft Lbs ST AK 60 37 7 1 7 2 Fig 8 1 Fig 8 2 Subje...

Page 18: ...f a column of landscape oriented modules See Figure 10 3 Once the module is mounted click the mid clamp onto the module rail and slide the clamp onto the module frame See Figure 10 4 10 4 10 3 Adjusta...

Page 19: ......

Page 20: ...W rth Canada Limited Limit e 6330 Tomken Road Mississauga Ontario Canada L5T 1N2 Tel 905 564 6225 Fax 905 564 3671 www wurthcanada com...

Reviews: