background image

SF

ERASOL

E N

E R GY

Use and maintenance manual

I

N

T

EGRA

T

E

S

T

ORAGE

 C

OLLE

CT

OR

 

SFERASOL

TM

Summary of Contents for SFERASOL SF-A

Page 1: ...SFERASO L E NERG Y Use and maintenance manual INTEGRATED STORAGE COLLECTOR SFERASOLTM ...

Page 2: ...any changes or modifications as described in this manual INTEGRATED STORAGE COLLECTOR SFERASOLTM USE AND MAINTENANCE MANUAL SFERASOL ENERGY S R L VIA G PASCOLI 1 10060 SCALENGHE TO ITALIA TEL 39 011 194 577 34 MOB 39 335 18 93 453 INFO SFERASOLENERGY COM WWW SFERASOLENERGY COM ...

Page 3: ...rasolTM positioning 8 SferasolTM installation 11 Start up 12 Maintenance 13 Level Control 14 Troubleshooting and spare parts 15 SferasolTM without tank inside SF A 16 SferasolTM Data Sheet SF S 17 SferasolTM Data Sheet SF A 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 INTEGRATED STORAGE COLLECTOR SFERASOLTM USE AND MAINTENANCE MANUAL ...

Page 4: ...that circulates in the two hemispheres The liquid is then conveyed to the internal exchanger heating the water contained in the boiler Water temperature of mains supply is not constant during the year During seasons with few sun exposure and low environmental temperature SFERASOLTM ensures pre heating of water and must be supported by the main hot water heating system As far as heating losses duri...

Page 5: ...be applied also with the safety device installation Spare parts requirements shall be in accordance with the manufacturer specifi cations Safety basic instructions SFERASOLTM has been manufactured respecting safety rules and in accordance with Machinery Directives 2006 42CE 2006 95 CE 2004 108 CE Final user could be in danger if the machine components are damaged or worn out or if SFERASOLTM is im...

Page 6: ... pump for the thermal fluid in the SFERASOL Thermostat sets at 3 Delta T Absorbers in metal coated with black mat heat resistant paint Transparent covering made in shockproof plastic material methacrylate ultraviolet rays resistant and it optimizes the effect greenhouse Inlet outlet water AISI 304 S S connections Inlet outlet water copper connections Safety valve Base made in AISI 304 S S 20 mm th...

Page 7: ...ioned SFERASOLTM panel should be slippering protected during transport to avoid damages If SFERASOLTM panel has already worked disconnect all connections before mo ving the machine In case a fork lift or crane are not available SFERASOLTM panel should be hand led considering the weight of the appliance Use the special white plastic cover supplied for the appliance storage SFERASOLTM can be stored ...

Page 8: ...d must be planned so that is su itable to hold the machine weight Before machine positioning the area must be cleaned and planarity must be checked by a level device Each difference from optimal condition should be modified by the use of thickness sheets Connections Customer shall agree with the Installation Service all necessary plumbing and electri cal connections to ensure correct installation i...

Page 9: ...uring maximum sun thermal radiation Basement on which the machine will be positioned must be planned so that is sui table to hold the machine weight Awellcorresponding to the appliance base should be advisable and layunderground a piping connection forwater and electrical connection min diam 100 mm Fix SFERASOLTM to the support foot through 4 wedges diam 8 mm in the apposite holes on the base ensu...

Page 10: ...sure that cold water pressure is less than 6 bar Electrical connections Electrical connections must be done by specialized electrician or by instructed staff only All operations on electrical devices connections maintenance etc must be done with electrical supply excluded through apposite switches Warning During all installation and connection operations the appliance must be cove red by the specia...

Page 11: ...n water is out coming without air bubbles Connect warm water piping to the outlet heated water circuit connection to SFERASOLTM An apposite pressure gear must be fitted if pressure is exceeding 6 bar Remove the plug from the board Pass the end of the cable through the cable fastening and bring it to the electrical part Fit a bipolar power supply sectionalising switch Connect 220V 50 Hz power suppl...

Page 12: ...t cold water valve Note circulator rotation speed is set by Manufacturer at first speed 950 RPM such setting must not be change 8 Working principles A soon as a temperature difference between thermal liquid and storage tank wa ter the control board activates circulating pump which moves thermal liquid until same storage tank temperature is reached with minimum power consumption Thermal re balancing...

Page 13: ...n case of damage connections must be replaced by specialized staff Magnesium anode must be carefully checked by Authorized Service Cen tre Any relevant labour costs and component expenses shall be at Custo mer s charge Thermal liquid of the closed circuit must be carefully checked by Authori zed Service Centre Any relevant re filling or replacement shall be done by Authorized Centre and any labour ...

Page 14: ...out disconnecting power supply To re start the appliance after a long non working period follow instructions indicated in relevant paragraph 14 INTEGRATED STORAGE COLLECTOR SFERASOLTM USE AND MAINTENANCE MANUAL Level Control 10 You will find a plug with dipstick to measure the glycol level in the Sferasol Set the Sferasol SF S as required by the O M manual unscrew the eyebolt and remove the brass ...

Page 15: ...ller 11 Replace Control Unit Replace Circulation Pump Replace Sensor Replace Sensor Replace Sensor Replace Sensors Replace Sensor Replace Sensor Replace Control Unit Circulation pump does not run F FA AILU U UR R RE E POSSIBLE ROOT CAUSE WHAT TO DO Circulation pump always on Control Unit out of order Circulation Pump out of order Temp sensor interrupted infinite resistance Outer temp sensor short ...

Page 16: ...r Thermal fluid Primary circuit will be closed and will be charged but regarding TOTAL primary circuit necessary quantity of thermal liquid shall be quantified de pending on the realized system Regarding SFERASOLTM without storage tank always consider that dimensioning is not made by Sferasol S r l so any damages occurred or any malfunctioning to the final system shall not be attributable to Sfera...

Page 17: ...erical Gross total surface 4 524 m2 Aperture surface 1 130 m2 Net total surface 0 891 m2 Nr of coverages 1 Coverage Material Merthacrylate Coverage thickness 3 mm Structure material INOX AISI 304 Stainless Steel Net mass 130 kg Outer dimensions 1200 1200 1600 mm Absorber Material 09 10 P06 steel Surface treatment black selective paint high opacity Connections copper pipes Ø 8mm Thermalconvector fl...

Page 18: ...of Collectors 1 Gross Collector Surface 4 524 m2 Collector Data Type Spherical Gross total surface 4 524 m2 Aperture surface 1 130 m2 Net total surface 0 891 m2 Nr of coverages 1 Coverage Material Merthacrylate Coverage thickness 3 mm Structure material INOX AISI 304 Stainless Steel Net mass 80 kg Outer dimensions 1200 1200 1600 mm Absorber Material 09 10 P06 steel Surface treatment black selectiv...

Page 19: ...Thank you for choosing SFERASOLTM INTEGRATED STORAGE COLLECTOR SFERASOLTM USE AND MAINTENANCE MANUAL ...

Page 20: ...Via G Pascoli 1 10060 Scalenghe TO ITALIA Tel 39 011 194 577 34 MOB 39 335 18 93 453 info sferasolenergy com www sferasolenergy com S FERASO L E NERG Y ...

Reviews: