Sferasol
TM
positioning.
I
nstallation area requirements.
Follow carefully instructions below before connecting and starting SFERASOL
TM
panel.
Manufacturer will not be responsible for damages caused by the failure in re-
specting the following requirements
Packing removal.
SFERASOL
TM
packing must be removed in the installation place to avoid shocks
during transport. Keep the appliance covered until the boiler is
fi
lled with sanitary
water, in order to avoid
fi
lling liquid boiling
I
nstallation place and base.
Choose carefully installation place and base before installation.
Basement on which the machine will be positioned must be planned so that is su-
itable to hold the machine weight. Before machine positioning the area must be
cleaned and planarity must be checked by a level device. Each di
ff
erence from
optimal condition should be modi
fi
ed by the use of thickness sheets.
C
onnections.
Customer shall agree with the Installation Service all necessary plumbing and electri-
cal connections to ensure correct installation in accordance with Electrical and Plum-
bing Regulations currently in force.
Grounding.
SFERASOL
TM
must be connected to the general ground network.
Orienting and shading.
Correct installation is fundamental for maximum e
ffi
ciency of the solar system.
During installation follow the indications below in order to ensure maximum e
ffi
ciency
of the solar system.
8
6
INTEGRATED STORAGE COLLECTOR SFERASOL
TM
USE AND MAINTENANCE MANUAL