Index
Turb 555 / Turb 555 IR
80
ba41113e07
04/2009
N
Nephelo
............................................... 22
NTU
...................................................... 22
O
Obligations of the operator
................ 11
Operating safety
................................. 10
Options
................................................ 75
Output device
...................................... 59
Output interval
.................................... 47
P
Periodical measured value output
... 47,
52, ......................................................... 59
Plug-in power supply
............................ 8
Pour-through vessel
........................... 25
Purge system
................................ 25, 29
R
Ratio method
................................. 47, 49
Reset
.................................................... 58
Resetting to default settings
.............. 58
Resolution
..................................... 47, 49
Rinsing the cuvette shaft
..................... 8
S
Safe operation
.................................... 11
Safety precautions
............................... 9
Scope of delivery
................................ 13
Sequence of the calibration
............... 39
Setting the date
.................................. 54
Setting the time
................................... 56
Setup
.................................................... 47
Setup code
.............................. 34, 47, 51
Setup function
..................................... 47
Short instructions
................................ 13
Sockets
.................................................. 8
Status indicator
..................................... 7
Supply values for the dry air purge
system
.................................................. 33
T
Target group
.......................................... 9
Time
..................................................... 47
W
Warm-up period
............................ 15, 23
Summary of Contents for Turb 555
Page 1: ...ba41113e07 04 2009 Turb 555 Turb 555 IR Operating Manual Turbidity measuring instrument...
Page 12: ...Safety Turb 555 Turb 555IR 12 ba41113e07 04 2009...
Page 16: ...Commissioning Turb 555 Turb 555IR 16 ba41113e07 04 2009...
Page 62: ...Operation Turb 555 Turb 555IR 62 ba41113e07 04 2009...
Page 66: ...Maintenance cleaning disposal Turb 555 Turb 555IR 66 ba41113e07 04 2009...
Page 74: ...Technical data Turb 555 Turb 555IR 74 ba41113e07 04 2009...
Page 81: ......