Turb 555 / Turb 555 IR
Operation
61
ba41113e07
04/2009
4.6.3 Calibration record
If a printer or PC is connected and switched on, a calibration
record is automatically output at the end of the calibration.
Sample printout:
Calibration
Data output
The following data is output:
Date: 29 Mar 2000 14:04:37
Last Cal: 29 Mar 2000 14:04:35
Cal. Interval: 30 Day(s)
QC-Security Code OFF
0.02 NTU 29 Mar 2000 14:04:35
10.0 NTU 29 Mar 2000 14:01:53
100.0 NTU 26 Mar 2000 12:56:31
1750. NTU 29 Mar 2000 13:49:00
10000 NTU 20 Mar 2000 10:51:27
Next Cal: 28 Apr 2000
Date
Date and time of the current
calibration
Last Cal
Date and time of the last
calibration
Cal Interval
Selected calibration interval
QC-Security Code
Code function "ON" or "OFF"
0.02 NTU
Calibration standards with the date
of the last successful calibration
10.0 NTU
100.0 NTU
1750. NTU
10000 NTU
Next Cal
Date of the next calibration accord-
ing to the calibration interval
Summary of Contents for Turb 555
Page 1: ...ba41113e07 04 2009 Turb 555 Turb 555 IR Operating Manual Turbidity measuring instrument...
Page 12: ...Safety Turb 555 Turb 555IR 12 ba41113e07 04 2009...
Page 16: ...Commissioning Turb 555 Turb 555IR 16 ba41113e07 04 2009...
Page 62: ...Operation Turb 555 Turb 555IR 62 ba41113e07 04 2009...
Page 66: ...Maintenance cleaning disposal Turb 555 Turb 555IR 66 ba41113e07 04 2009...
Page 74: ...Technical data Turb 555 Turb 555IR 74 ba41113e07 04 2009...
Page 81: ......