Operation
Turb 555 / Turb 555 IR
44
ba41113e07
04/2009
Terminating the
calibration
prematurely
To terminate the calibration process before the scheduled
end, proceed as follows:
Note
If you have not carried out all calibration steps correctly, the
instrument cannot measure with the specified accuracy.
Note
You can switch off the instrument only after you have fin-
ished or terminated the calibration according to the program.
Calibration record
If a printer or PC is connected and switched on, a calibration
record is automatically output (sample printout, see section
4.6.3).
1 Wait until the current calibration step is finished and
the instrument asks you to insert the next calibration
standard.
2 Press the
8
or
2
key until END is displayed in the
lower display line.
3 Press the
1
key.
The instrument returns to the measuring mode (
a
is displayed). If a printer or PC is connected and
switched on, a calibration record is automatically out-
put (see section 4.6.3 C
ALIBRATION
RECORD
).
Summary of Contents for Turb 555
Page 1: ...ba41113e07 04 2009 Turb 555 Turb 555 IR Operating Manual Turbidity measuring instrument...
Page 12: ...Safety Turb 555 Turb 555IR 12 ba41113e07 04 2009...
Page 16: ...Commissioning Turb 555 Turb 555IR 16 ba41113e07 04 2009...
Page 62: ...Operation Turb 555 Turb 555IR 62 ba41113e07 04 2009...
Page 66: ...Maintenance cleaning disposal Turb 555 Turb 555IR 66 ba41113e07 04 2009...
Page 74: ...Technical data Turb 555 Turb 555IR 74 ba41113e07 04 2009...
Page 81: ......