Operation
Turb 555 / Turb 555 IR
42
ba41113e07
04/2009
16 Insert the 100 NTU calibration standard into the cu-
vette shaft.
17 Align the cuvette.
18 Press the
1
key.
During the calibration step, the
c
and
s
sym-
bols flash. The lower display line shows the remain-
ing measuring cycles until the end of the calibration
step. Then, the calibration step is carried out once
more.
19 Wait until the calibration step is finished.
The instrument asks you to insert the next calibration
standard (10.00 = 10 NTU).
20 Insert the 10 NTU calibration standard into the cu-
vette shaft.
21 Align the cuvette.
Summary of Contents for Turb 555
Page 1: ...ba41113e07 04 2009 Turb 555 Turb 555 IR Operating Manual Turbidity measuring instrument...
Page 12: ...Safety Turb 555 Turb 555IR 12 ba41113e07 04 2009...
Page 16: ...Commissioning Turb 555 Turb 555IR 16 ba41113e07 04 2009...
Page 62: ...Operation Turb 555 Turb 555IR 62 ba41113e07 04 2009...
Page 66: ...Maintenance cleaning disposal Turb 555 Turb 555IR 66 ba41113e07 04 2009...
Page 74: ...Technical data Turb 555 Turb 555IR 74 ba41113e07 04 2009...
Page 81: ......