Assembly
3730 E. Southern Avenue, Phoenix, AZ 85040 USA
800-778-8779
Workhorseproducts.com
11
Step 4: Connecting to the Belt Drive Motor
1. On the outfeed side, take the belt drive motor
cable and feed it through the hole located at the
edge of the arm.
The size and specifications of the electrical connections made during installation
MUST BE DETERMINED BY
A LICENSED ELECTRICIAN. FOLLOW ALL LOCAL BUILDING AND PLANNING CODES
.
Failure to do so may
result in damage to the unit, building, or cause serious injury.
Before any electrical connections are made verify all safety precautions have been taken to ensure the safety
of all shop personnel. The dedicated breaker providing power to the dryer
MUST BE OFF, AND USE OF A SER-
VICE LOCKOUT TAG IS REQUIRED
. This will prevent anyone from turning on the power as the connections are
being made. After all safety precautions have been taken the electrical connections can be made. All electrical
connections must be made by a licensed electrician. Refer to factory specifications for proper installation.
2. Connect the belt drive motor cable to the motor
cable. Congratulations! The Powerhouse Series II Dry-
er is now fully assembled!