Debarker Installation
Upper Harness Installation
2
2-23
MKI96DB98doc011711
Debarker Installation
See Figure 2-20.
E15HP/E20HP/E25HP MILLS
DANGER!
On electric mills, hazardous voltage inside the
disconnect box, starter box, and at the electric motor can
cause shock, burns, or death. Disconnect and lock out
power! Follow all applicable electrical codes.
1.
Route the upper power harness from the debarker control box under and around the
motor mount towards the alternator. While routing, use provided clamps/drill holes as
necessary to secure the harness in place.
2.
Use a provided wire tie to secure the harness tubing to the existing sawmill control har-
ness a few inches from where the harness ends near the alternator. Cut excess tubing
from the debarker power harness, leaving the wires long.
3.
Route the red power wire to the alternator battery post. Cut excess wire as needed. Use
supplied ring terminal for wire connection as needed.
IMPORTANT!
Make sure that the ring terminal does not
touch the alternator body.
4.
Route the black power wire to the engine ground. Cut excess wire as needed. Use sup-
FIG. 2-20
3H0322
Black/pink fuel
solenoid valve wire