
Debarker Installation
Upper Harness Installation
Debarker Installation
MKI96DB98doc011711
2-22
2
6.
Route the small black debarker control wire to the T-tap terminal and cut excess wire and
sleeving length as needed. Connect the supplied blue male quick connect terminal to the
end of the small black debarker wire and plug the quick connect into the T-tap terminal.
See Figure 2-19.
D40 MILLS
1.
Route the upper power harness from the debarker control box under and around the
motor mount towards the starter. While routing, use provided clamps/drill holes as neces-
sary to secure the harness in place.
2.
Use a provided wire tie to secure the harness tubing to the existing sawmill control har-
ness a few inches from where the harness ends near the starter. Cut excess tubing from
the debarker power harness, leaving the wires long.
3.
Route the red power wire to the starter battery post. Cut excess wire as needed. Use sup-
plied ring terminal for wire connection as needed.
IMPORTANT!
Make sure that the ring terminal does not
touch the starter body.
4.
Route the black power wire to the engine ground. Cut excess wire as needed. Use sup-
plied ring terminal for wire connection as needed.
5.
Connect the small black debarker control wire to the existing black and pink fuel solenoid
valve wire. To do this, crimp the supplied blue T-tap terminal around the existing
black/pink fuel solenoid valve wire.
6.
Route the small black debarker control wire to the T-tap terminal and cut excess wire and
sleeving length as needed. Connect the supplied blue male quick connect terminal to the
end of the small black debarker wire and plug the quick connect into the T-tap terminal.
FIG. 2-19