
Debarker Installation
Debarker Installation
Debarker Installation
MKI96DB98doc011711
2-8
2
3.
Assemble the debarker cutting head to the mount plate on the frame.
Use the two provided U-bolts, 5/16” split lock washers and 5/16-18 hex nuts to secure in
place.
See Figure 2-7.
Install the flexible guard and guard bracket to the pivot arm guard
bracket. Secure in place with the provided 1/4” flat washers, 1/4” split lock washers, and
1/4-20 x 3/4” hex head full thread bolts.
FIG. 2-7
Cutting head
assembly
Pivot arm
guard
bracket
Guard bracket
Flexible guard
Mount plate
3H0204B