
Debarker Installation
Control Component Installation
Debarker Installation
DB17doc072219
2-12
2
14.
Connect the red #200 wire from the debarker on/off switch to the sawmill control:
Connect red wire #200 to the existing short red wire connected to terminal #3 of the
power feed drum switch. Use the provided #10 screw, washer and lock nut to connect the
wires. Wrap the connection with the provided piece of rubber tubing and secure with a tie
wrap.
See Figure 2-10.
FIG. 2-10
Rubber
Tubing
Screw
3H0344-2
Lock Nut
Flat Washer
Debarker wire #200
6” Wire from
Power Feed Drum
Switch Terminal