Debarker Installation
Control Component Installation
2
2-9
DB17doc072219
Debarker Installation
4.
Locate the bundle of wires on the floor of the sawmill control box. Make sure the large
black #24 wire is connected to the rear ground stud. Connect the large red #23 wire to the
empty terminal on the provided 70 amp breaker. Do not overtighten this connection.
Overtightening could cause component breakage.
5.
Install the 70 amp breaker and rubber boot to the large hole on the back of the control
box. Be sure the breaker terminals do not touch any other components or wires inside the
control box.
6.
Install the provided 15 amp breaker to the two small holes in the back of the control box.
Use the existing screws and nuts (removed earlier) to secure in place.
See Figure 2-7.
FIG. 2-7
Mounting
Screws
15 Amp Breaker
70 Amp Breaker
Mounting Nuts
Rubber
Boot
Rear Ground Stud
24
23
LX0043-3