
Debarker Installation
Control Component Installation
Debarker Installation
DB17doc072219
2-8
2
2.3
Control Component Installation
DANGER!
On electric mills, hazardous voltage inside the
disconnect box, starter box, and at the electric motor can
cause shock, burns, or death. Disconnect and lock out
power! Follow all applicable electrical codes.
DANGER!
Before performing any service to this equip-
ment, turn the key to the OFF (0) position, remove the key,
and disconnect the sawmill battery ground terminal. Failure
to do so will result in serious injury or death.
for the appropriate wiring diagram to aid in installation.
1.
Remove the side, front and rear panels (leave wire connections) from the control box.
2.
Locate the solenoid mounting studs in the control box. Place the solenoid on the mount-
ing studs and place the diode assembly ring terminal over one of the studs. Use the two
1/4-20 self-locking nuts provided to secure in place.
See Figure 2-6.
3.
Remove the two small bolts and nuts and the one large bolt and nut from the back of the
control box.
FIG. 2-6
LX0043-2
Mounting Studs
Self-Locking Nuts
Debarker Solenoid