SECTION 2 SETUP & OPERATION
2.1
Stationary Sawmill Setup
See Figure 2-1.
Set up the mill on firm footing. Level by eye. Fasten the mill to the floor to
prevent any creep after prolonged use.
NOTE:
Make sure the unit is level before securing. It IS possible to twist the mill frame by
jacking one foot higher than the others.
FIG. 2-1